Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07424
Well Classification: CBM Status: PR - 8/6/2010
Well Name/No:HILL RANCH #03-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/6/2010
FacilityID:260407LocationID:308037
County:LAS ANIMAS #071Location:NWSW 3 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8094 ft.
Basin:RATON BASIN  
Planned Location:1752FSL  2 FWLLat/Long: 37.023815 / -104.884069Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.023800 / -104.884030Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/6/2010             Measured TD: 2575 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/6/2010
Wellbore Permit
Permit #:20011145 Expiration Date:6/14/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/12/2001
Spud Date:8/8/2001Spud Date Is:ACTUAL
Measured TD:2575 ft.Measured PB depth:2539 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON, SINGLE INDUCTION, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 572 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 572 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2534 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 2534 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2132 ft.NN
VERMEJO COAL2132 ft.2419 ft.NN
TRINIDAD2419 ft.2575 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/17/2001                Interval Top: 2147 ft.    Interval Bottom: 2391 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/12/2001Choke Size:0.438 in.
Formation Name:VERMEJO COALCommingled:
Production Method:PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/12/2001
Treatment Summary:26,200# 16/30 SAND & 168 BBLS FLUID
Tubing Size:2.875 in.Tubing Setting Depth:2415 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 129
CASING_PRESS 32
MCF_GAS 129
Perforation Data:
Interval Top:2147 ft.# Of Holes:132
Interval Bottom:2391 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/6/2010                  Interval Top: 602 ft.    Interval Bottom: 2391 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2450 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 84
BTU_GAS 1002
CALC_BBLS_H2O 84
CALC_MCF_GAS 182
CASING_PRESS 4
MCF_GAS 182
TUBING_PRESS 1
Perforation Data:
Interval Top:602 ft.# Of Holes:220
Interval Bottom:2391 ft.Hole Size:0.51 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 602 ft.    Interval Bottom: 1469 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/5/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2010
Treatment Summary:Acidized w/4,400 gals 15% HCl acid. Frac'd w/211,510 gals 20# Delta 140 w/Sandwedge OS carrying 27,249# 16/30 Brady sd & 438,063# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:602 ft.# Of Holes:88
Interval Bottom:1469 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)36373
GOR
GOR DeterminationMCFE
Average BOE per Day17.184
Average MCFE per Day99.671

 Federal Financial Assurance  i 

 Tribal Well  i No