|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 6/21/2011 Measured TD: 2635 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 6/21/2011 | | Wellbore Permit | | | Permit #: | 201144 | Expiration Date: | 6/14/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/18/2001 | | Spud Date: | 8/5/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2635 ft. | Measured PB depth: | 2584 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY/NEUTRON SINGLE INDUCTION, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 303 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 303 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2589 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 415, Top: 0 ft., Bottom: 2589 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2200 ft. | N | N | | VERMEJO COAL | 2200 ft. | 2510 ft. | N | N | | TRINIDAD | 2510 ft. | 2635 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/27/2001 Interval Top: 2225 ft. Interval Bottom: 2482 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 10/18/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/18/2001 | | Treatment Summary: | 16,700# 16/30 SAND & 165 BBLS FLUID // 25,700# 16/30 SAND & 214 BBLS FLUID // 16,200# 16/30 SAND & 156 BBLS FLUID //24,500# 16/30 SAND & 211 BBLS FLUID. // 50 GALS 7.5% HCL; 14,000# 16/30 SAND & 231 BBLS FLUID // 16,600# 16/30 SAND & 146 BBLS FLUID. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2490 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/27/2001 | Test Method: | PUMP | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 290 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 290 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 407 | | CASING_PRESS | 40 | | MCF_GAS | 407 |
| | Perforation Data: | | Interval Top: | 2225 ft. | # Of Holes: | 32 | | Interval Bottom: | 2482 ft. | Hole Size: | 0.51 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 6/21/2011 Interval Top: 608 ft. Interval Bottom: 2482 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 6/20/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2494 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2011 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 79 | | BTU_GAS | 1006 | | CALC_BBLS_H2O | 79 | | CALC_MCF_GAS | 117 | | CASING_PRESS | 39 | | MCF_GAS | 117 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 608 ft. | # Of Holes: | 184 | | Interval Bottom: | 2482 ft. | Hole Size: | 0.51 in. |
|
Formation RTON Formation Classification: GW Status: CM - 7/18/2011 Interval Top: 608 ft. Interval Bottom: 2070 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 6/20/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/4/2011 | | Treatment Summary: | Acidized w/2,750 gals 15% HCl acid. Frac'd w/196,421 gals 20# Delta 140 w/Sandwedge OS carrying 429,314# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 608 ft. | # Of Holes: | 72 | | Interval Bottom: | 2070 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 40450 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 19.098 |
| Average MCFE per Day | 110.769 |
| Federal Financial Assurance | i | |
|
|