Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07418
Well Classification: CBM Status: PR - 2/7/2018
Well Name/No:APACHE CANYON #11-10V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2018
FacilityID:260253LocationID:308035
County:LAS ANIMAS #071Location:NWSE 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8594 ft.
Basin:RATON BASIN  
Planned Location:1872FSL  2532 FELLat/Long: 37.096563 / -104.964462Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.096500 / -104.964480Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2018
End Date: 1/4/2018
Reported: 1/26/2018
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2018             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2018
Wellbore Permit
Permit #:20011064 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/15/2002
Spud Date:2/17/2002Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:2453 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 694 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 0 ft., Bottom: 694 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2411 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 2411 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2009 ft.NN
VERMEJO COAL2009 ft.2304 ft.NN
TRINIDAD2304 ft.2434 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/20/2002                 Interval Top: 1945 ft.    Interval Bottom: 2228 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/20/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:30NO95 PC PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:3/15/2002
Treatment Summary:SEE SCANNED DOC# 1336286
Tubing Size:2.875 in.Tubing Setting Depth:2250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2002Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 0
CALC_BBLS_H2O 25
CALC_MCF_GAS 47
MCF_GAS 47
Perforation Data:
Interval Top:1945 ft.# Of Holes:176
Interval Bottom:2228 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 800 ft.    Interval Bottom: 1055 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/27/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/2010
Treatment Summary:Acidized w/2,200 gals 15% HCl acid. Frac'd w/136,577 gals 20# Delta 140 carrying 15,309# 16/30 Brady sd & 317,859# 12/20 Brady sd (157,200# 12/20 Brady sd coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:800 ft.# Of Holes:44
Interval Bottom:1055 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2018                  Interval Top: 799 ft.    Interval Bottom: 2230 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/27/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/4/2018Treatment End Date:1/4/2018
Treatment Summary:Perforated three Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the three Vermejo Coal intervals including Stage 1 - 2,190' - 98', 2,210' - 12' and 2,222' - 30', Stage 2 - 2,002' - 07', 2,020' - 22', 2,025' - 29' and 2,033' - 36', Stage 3 - 1,944' -46', 1,952' - 54', 1,960' - 68' and 1,970' - 78' (net - 52' or 208 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 500 gallons of 15% HCl, 127,003 gallons produced water, 159,474 lbs of 20/40 mesh Premium White Sand and 1,024,978 scf N2 were pumped. Stage 2 screened out when 2.0 ppg sand concentration downhole hit the perforations. Perforated two Raton Coal intervals including Stage 4 - 893' - 00' and Stage 5 - 799' - 01', 804' - 807', 822' - 24' and 829' - 834' (net - 19' or 76 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 400 gallons of 15% HCl, 92,043 gallons of produced water, 129,252 lbs of 20/40 mesh Premium White Sand and 471,773 scf N@ were pumped. The CTU was rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well.
Total fluid used in treatment (bbls):5233Max pressure during treatment (psi):3678
Total gas used in treatment (mcf):1496751Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:5
Total acid used in treatment (bbls):21Min frac gradient (psi/ft):0.52
Recycled water used in treatment (bbls):5212Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):288726Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:2253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/22/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BTU_GAS 933
CALC_BBLS_H2O 8
CALC_MCF_GAS 40
MCF_GAS 40
TUBING_PRESS 4
Perforation Data:
Interval Top:799 ft.# Of Holes:284
Interval Bottom:2230 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21346
GOR
GOR DeterminationMCFE
Average BOE per Day10.080
Average MCFE per Day58.485

 Federal Financial Assurance  i 

 Tribal Well  i No