Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07418
Well Classification: CBM Status: PR - 2/7/2018
Well Name/No:APACHE CANYON #11-10V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2018
FacilityID:260253LocationID:308035
County:LAS ANIMAS #071Location:NWSE 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8594 ft.
Basin:RATON BASIN  
Planned Location:1872FSL  2532 FELLat/Long: 37.096563 / -104.964462Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.096500 / -104.964480Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2018
End Date: 1/4/2018
Reported: 1/26/2018
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2018             Measured TD: 2455 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2018
Wellbore Permit
Permit #:20011064 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/15/2002
Spud Date:2/17/2002Spud Date Is:ACTUAL
Measured TD:2455 ft.Measured PB depth:2453 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 694 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 205, Top: 0 ft., Bottom: 694 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2411 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 2411 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2009 ft.NN
VERMEJO COAL2009 ft.2304 ft.NN
TRINIDAD2304 ft.2434 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/20/2002                 Interval Top: 1945 ft.    Interval Bottom: 2228 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/20/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:30NO95 PC PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:3/15/2002
Treatment Summary:SEE SCANNED DOC# 1336286
Tubing Size:2.875 in.Tubing Setting Depth:2250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2002Test Method:
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 0
CALC_BBLS_H2O 25
CALC_MCF_GAS 47
MCF_GAS 47
Perforation Data:
Interval Top:1945 ft.# Of Holes:176
Interval Bottom:2228 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 800 ft.    Interval Bottom: 1055 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/27/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/16/2010
Treatment Summary:Acidized w/2,200 gals 15% HCl acid. Frac'd w/136,577 gals 20# Delta 140 carrying 15,309# 16/30 Brady sd & 317,859# 12/20 Brady sd (157,200# 12/20 Brady sd coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:800 ft.# Of Holes:44
Interval Bottom:1055 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2018                  Interval Top: 799 ft.    Interval Bottom: 2230 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/27/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/4/2018Treatment End Date:1/4/2018
Treatment Summary:Perforated three Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the three Vermejo Coal intervals including Stage 1 - 2,190' - 98', 2,210' - 12' and 2,222' - 30', Stage 2 - 2,002' - 07', 2,020' - 22', 2,025' - 29' and 2,033' - 36', Stage 3 - 1,944' -46', 1,952' - 54', 1,960' - 68' and 1,970' - 78' (net - 52' or 208 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 500 gallons of 15% HCl, 127,003 gallons produced water, 159,474 lbs of 20/40 mesh Premium White Sand and 1,024,978 scf N2 were pumped. Stage 2 screened out when 2.0 ppg sand concentration downhole hit the perforations. Perforated two Raton Coal intervals including Stage 4 - 893' - 00' and Stage 5 - 799' - 01', 804' - 807', 822' - 24' and 829' - 834' (net - 19' or 76 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 400 gallons of 15% HCl, 92,043 gallons of produced water, 129,252 lbs of 20/40 mesh Premium White Sand and 471,773 scf N@ were pumped. The CTU was rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well.
Total fluid used in treatment (bbls):5233Max pressure during treatment (psi):3678
Total gas used in treatment (mcf):1496751Fluid density (lbs/gal):8.35
Type Of gas:NITROGENNumber Of staged intervals:5
Total acid used in treatment (bbls):21Min frac gradient (psi/ft):0.52
Recycled water used in treatment (bbls):5212Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):288726Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:2253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/22/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BTU_GAS 933
CALC_BBLS_H2O 8
CALC_MCF_GAS 40
MCF_GAS 40
TUBING_PRESS 4
Perforation Data:
Interval Top:799 ft.# Of Holes:284
Interval Bottom:2230 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21607
GOR
GOR DeterminationMCFE
Average BOE per Day10.202
Average MCFE per Day59.193

 Federal Financial Assurance  i 

 Tribal Well  i No