Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07417
Well Classification: CBM Status: PR - 8/19/2010
Well Name/No:APACHE CANYON #11-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/19/2010
FacilityID:260252LocationID:308034
County:LAS ANIMAS #071Location:SWNE 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8621 ft.
Basin:RATON BASIN  
Planned Location:1426FNL  1533 FELLat/Long: 37.102033 / -104.961042Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101970 / -104.961040Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/19/2010             Measured TD: 2422 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/19/2010
Wellbore Permit
Permit #:20011063 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/21/2002
Spud Date:2/19/2002Spud Date Is:ACTUAL
Measured TD:2422 ft.Measured PB depth:2420 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 722 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2407 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 2407 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1969 ft.NN
VERMEJO COAL1969 ft.2303 ft.NN
TRINIDAD2303 ft.2385 ft.NN
PIERRE2385 ft.2425 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/8/2010                  Interval Top: 2018 ft.    Interval Bottom: 2307 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/23/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2010
Treatment Summary:Acidized w/ 1,000 gals 15% HCl acid.
Formation Treatment
Treatment Date:3/21/2002
Treatment Summary:SEE SCANNED DOC# 1336274
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 0
CALC_BBLS_H2O 30
CALC_MCF_GAS 10
MCF_GAS 10
Perforation Data:
Interval Top:2018 ft.# Of Holes:196
Interval Bottom:2307 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/19/2010                 Interval Top: 817 ft.    Interval Bottom: 2307 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:2373 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/19/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BTU_GAS 1003
CALC_BBLS_H2O 6
CALC_MCF_GAS 44
MCF_GAS 44
TUBING_PRESS 54
Perforation Data:
Interval Top:817 ft.# Of Holes:284
Interval Bottom:2307 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 817 ft.    Interval Bottom: 1103 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/17/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2010
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/176,603 gals 20# Delta 140 carrying 26,400# 16/30 Brady sd & 371,900# 12/20 Brady sd (391,800# sd coated w/Sandwedge OS).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:817 ft.# Of Holes:88
Interval Bottom:1103 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)26543
GOR
GOR DeterminationMCFE
Average BOE per Day12.543
Average MCFE per Day72.723

 Federal Financial Assurance  i 

 Tribal Well  i No