Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07416
Well Classification: CBM Status: SI - 12/1/2023
Well Name/No:APACHE CANYON #13-08V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2023
FacilityID:260251LocationID:308033
County:LAS ANIMAS #071Location:SENE 13 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8189 ft.
Planned Location:1665FNL  915 FELLat/Long: 37.086963 / -104.940821Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.086960 / -104.940840Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 12/1/2023             Measured TD: 2365 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 12/1/2023
Wellbore Permit
Permit #:20011062 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/22/2001
Spud Date:7/16/2001Spud Date Is:ACTUAL
Measured TD:2365 ft.Measured PB depth:2353 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL (2)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 576 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 170, Top: 0 ft., Bottom: 576 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2325 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 939, Top: 1397 ft., Bottom: 2325 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1810 ft.NN
VERMEJO COAL1810 ft.2200 ft.NN
TRINIDAD2200 ft.2365 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/7/2001                  Interval Top: 1914 ft.    Interval Bottom: 2120 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/7/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:30N - 045 PC PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:8/22/2001
Treatment Summary:SEE SCANNED DOC# 1335934
Tubing Size:2.875 in.Tubing Setting Depth:2137 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2001Test Method:
Hours Tested:0Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 8
MCF_GAS 8
Perforation Data:
Interval Top:1914 ft.# Of Holes:132
Interval Bottom:2120 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 12/1/2023                 Interval Top: 624 ft.    Interval Bottom: 2120 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/21/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2010
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:2234 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 27
BBLS_OIL 0
BTU_GAS 1010
CALC_BBLS_H2O 27
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 66
CASING_PRESS 2
MCF_GAS 66
TUBING_PRESS 15
Perforation Data:
Interval Top:624 ft.# Of Holes:224
Interval Bottom:2120 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/25/2010                 Interval Top: 624 ft.    Interval Bottom: 1100 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/21/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2010
Treatment Summary:ACIDIZED W/4,000 GALS 15% HCL ACID. FRAC'D W/167,680 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 33,305# 16/30 BRADY SD & 423,06 8# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:624 ft.# Of Holes:92
Interval Bottom:1100 ft.Hole Size:0.45 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
11/30/2023
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No