Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07413
Well Classification: CBM Status: PR - 8/15/2011
Well Name/No:APACHE CANYON #18-12V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2011
FacilityID:260247LocationID:308030
County:LAS ANIMAS #071Location:NWSW 18 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7788 ft.
Planned Location:1566FSL  344 FWLLat/Long: 37.081343 / -104.936641Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.081346 / -104.936525Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/6/2011
End Date: 7/6/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 285
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/15/2011             Measured TD: 2065 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/15/2011
Wellbore Permit
Permit #:011059 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/23/2001
Spud Date:7/12/2001Spud Date Is:ACTUAL
Measured TD:2065 ft.Measured PB depth:2062 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 637 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 637 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2020 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 2020 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1570 ft.NN
VERMEJO COAL1570 ft.1954 ft.NN
TRINIDAD1954 ft.2065 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 1611 ft.    Interval Bottom: 1860 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/21/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2011
Treatment Summary:Perfed new holes fr/1611' - 1619.5' (6 holes-included in number above). Acidized w/800 gals 15% HCl acid. Refrac'd fr/1611' - 1797' w/164,127 gals 20# Delta 140 w/Sandwedge OS carrying 166,121# 16/30 Nebraska sd.
Formation Treatment
Treatment Date:8/23/2001
Treatment Summary:SEE SCANNED DOC# 1335944
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 50
MCF_GAS 50
Perforation Data:
Interval Top:1611 ft.# Of Holes:126
Interval Bottom:1860 ft.Hole Size:0.42 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/15/2011                 Interval Top: 661 ft.    Interval Bottom: 1860 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/7/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1914 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
BTU_GAS 1002
CALC_BBLS_H2O 57
CALC_MCF_GAS 127
MCF_GAS 127
TUBING_PRESS 2
Perforation Data:
Interval Top:661 ft.# Of Holes:176
Interval Bottom:1860 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 661 ft.    Interval Bottom: 1345 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/7/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/6/2011
Treatment Summary:Acidized w/2,500 gals 15% HCl acid. Frac'd w/91,331 gals 20# Delta 140 w/Sandwedge OS carrying 315,745# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:661 ft.# Of Holes:50
Interval Bottom:1345 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17853
GOR
GOR DeterminationMCFE
Average BOE per Day8.389
Average MCFE per Day48.655

 Federal Financial Assurance  i 

 Tribal Well  i No