Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07412
Well Classification: CBM Status: PR - 8/10/2011
Well Name/No:APACHE CANYON #18-15V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/10/2011
FacilityID:260246LocationID:308029
County:LAS ANIMAS #071Location:SWSE 18 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7670 ft.
Planned Location:1077FSL  2354 FELLat/Long: 37.079993 / -104.928350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.080040 / -104.928280Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/5/2011
End Date: 7/5/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 286
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/10/2011             Measured TD: 2065 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/10/2011
Wellbore Permit
Permit #:011058 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/15/2001
Spud Date:7/14/2001Spud Date Is:ACTUAL
Measured TD:2065 ft.Measured PB depth:2060 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 490 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2056 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 2056 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1574 ft.NN
VERMEJO COAL1574 ft.1927 ft.NN
TRINIDAD1927 ft.2065 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/25/2001                 Interval Top: 1654 ft.    Interval Bottom: 1826 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:20N - 095 PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:8/15/2001
Treatment Summary:SEE SCANNED DOC# 1335947
Tubing Size:2.875 in.Tubing Setting Depth:1814 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/25/2001Test Method:
Hours Tested:0Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 328
BBLS_OIL 0
CALC_BBLS_H2O 328
CALC_MCF_GAS 1
MCF_GAS 1
Perforation Data:
Interval Top:1654 ft.# Of Holes:84
Interval Bottom:1826 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/10/2011                 Interval Top: 522 ft.    Interval Bottom: 1826 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/6/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1900 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 999
CALC_MCF_GAS 40
CASING_PRESS 1
MCF_GAS 40
Perforation Data:
Interval Top:522 ft.# Of Holes:140
Interval Bottom:1826 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/26/2011                 Interval Top: 522 ft.    Interval Bottom: 1340 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/6/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/5/2011
Treatment Summary:Acidized w/2,800 gals 15% HCl acid. Frac'd w/78,953 gals 20# Delta 140 w/Sandwedge OS carrying 284,186# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:522 ft.# Of Holes:56
Interval Bottom:1340 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23039
GOR
GOR DeterminationMCFE
Average BOE per Day10.876
Average MCFE per Day63.102

 Federal Financial Assurance  i 

 Tribal Well  i No