|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/21/2001 Measured TD: 2297 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/21/2001 | | Wellbore Permit | | | Permit #: | 011056 | Expiration Date: | 5/28/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/30/2001 | | Spud Date: | 6/30/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2297 ft. | Measured PB depth: | 2296 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL (2) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 782 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 254, Top: 0 ft., Bottom: 782 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2290 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 1748 ft., Bottom: 2290 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2290 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 740 ft., Bottom: 1748 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1843 ft. | N | N | | VERMEJO COAL | 1843 ft. | 2202 ft. | N | N | | TRINIDAD | 2202 ft. | 2290 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/21/2001 Interval Top: 1895 ft. Interval Bottom: 2151 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | 20N-095 PC PUMP | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2001 | | Treatment Summary: | PERFORATIONS: 2140'-44', 2148'-51' (28 HOLES) FRAC 1ST STAGE W/ 32,355 GLS FRAC FLUID, 240,000 SCF N2, 40,000# 16/30 BRADY SAND, 14 GAL ACID. PERFORATIONS: 2089'-94', 2113'-18' (40 HOLES) FRAC 2ND STAGE W/ 40,279 GLS FRAC FLUID, 300,000 SCF N2 50,500# 16/30 BRADY SAND . SCREENED OUT. PERFORATIONS: 1929'-32', 1946'-51' (32 HOLES) FRAC 3RD STAGE W/ 37,028 GLS FRAC FLUID, 225,000 SCF N2, 40,000# 16/30 BRADY SAND. PERFORATIONS: 1895'-98' (12 HOLES) FRAC 4TH STAGE W/ 21,802 GLS FRAC FLUID, 85,000 SCF N2, 18,100# 16/30 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2137 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/21/2001 | Test Method: | | | Hours Tested: | 0 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 0 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 0 | | MCF_GAS | 2 |
| | Perforation Data: | | Interval Top: | 1895 ft. | # Of Holes: | 112 | | Interval Bottom: | 2151 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 39222 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 18.512 |
| Average MCFE per Day | 107.377 |
| Federal Financial Assurance | i | |
|
|