|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2025 Measured TD: 2487 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | 20011055 | Expiration Date: | 5/28/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/8/2002 | | Spud Date: | 2/13/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2487 ft. | Measured PB depth: | 2485 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1045 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 1045 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2475 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 0 ft., Bottom: 2475 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2048 ft. | N | N | | VERMEJO COAL | 2048 ft. | 2387 ft. | N | N | | TRINIDAD | 2387 ft. | 2490 ft. | N | N | | PIERRE | 2490 ft. | 2515 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 2053 ft. Interval Bottom: 2368 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 3/15/2002 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | 30NO45 PC PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/8/2002 | | Treatment Summary: | SEE SCANNED DOC# 1336277 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2393 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/15/2002 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 65 | | CALC_BBLS_H2O | 65 | | CALC_MCF_GAS | 1 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 2053 ft. | # Of Holes: | 92 | | Interval Bottom: | 2368 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2586 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.219 |
| Average MCFE per Day | 7.101 |
| Federal Financial Assurance | i | |
|
|