Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07406
Well Classification: CBM Status: SI - 2/1/2025
Well Name/No:APACHE CANYON #07-15V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2025
FacilityID:260236LocationID:308024
County:LAS ANIMAS #071Location:SWSE 7 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7723 ft.
Basin:RATON BASIN  
Planned Location:1014FSL  1370 FELLat/Long: 37.094373 / -104.924980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.094290 / -104.924940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 2/1/2025             Measured TD: 2155 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 2/1/2025
Wellbore Permit
Permit #:20011049 Expiration Date:5/27/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/25/2001
Spud Date:7/19/2001Spud Date Is:ACTUAL
Measured TD:2155 ft.Measured PB depth:2148 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL (2)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 576 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 576 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2118 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 481, Top: 1246 ft., Bottom: 2118 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 141, Top: 0 ft., Bottom: 1246 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1641 ft.NN
VERMEJO COAL1641 ft.1986 ft.NN
TRINIDAD1986 ft.2155 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 1/27/2005                 Interval Top: 1675 ft.    Interval Bottom: 1951 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/29/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/17/2005
Treatment Summary:NEW PERFS FR/1950'-1951', 1940'-1941', 1925-1926', 1908'-1910;, 1766'-1768', 1753'-1754', 1692'-1693' & 1675'-1676'. ACIDIZED W/1,000 GALS 15% HCL ACID. REFRAC'D W/112,302 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 41,000# 16/30 BRADY SD & CONT NEXT PG
Tubing Size:2.875 in.Tubing Setting Depth:2022 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 151
BBLS_OIL 0
CALC_BBLS_H2O 151
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 1
MCF_GAS 0
TUBING_PRESS 50
Perforation Data:
Interval Top:1675 ft.# Of Holes:120
Interval Bottom:1951 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 2/1/2025                  Interval Top: 644 ft.    Interval Bottom: 1951 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/25/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/25/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:1999 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/27/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 112
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 112
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 6
MCF_GAS 0
TUBING_PRESS 15
Perforation Data:
Interval Top:644 ft.# Of Holes:191
Interval Bottom:1951 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/27/2010                 Interval Top: 644 ft.    Interval Bottom: 939 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/25/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/10/2010
Treatment Summary:ACIDIZED W/3,550 GALS 15% HCL ACID. REFRAC'D W/168,937 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26, 880# 16/30 BRADY SD & 361,740" 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:644 ft.# Of Holes:71
Interval Bottom:939 ft.Hole Size:0.45 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1587
GOR
GOR DeterminationMCFE
Average BOE per Day0.737
Average MCFE per Day4.266

 Federal Financial Assurance  i 

 Tribal Well  i No