|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 2/1/2025 Measured TD: 2155 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 2/1/2025 | | Wellbore Permit | | | Permit #: | 20011049 | Expiration Date: | 5/27/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/25/2001 | | Spud Date: | 7/19/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2155 ft. | Measured PB depth: | 2148 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL (2) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 576 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 576 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2118 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 481, Top: 1246 ft., Bottom: 2118 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 141, Top: 0 ft., Bottom: 1246 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1641 ft. | N | N | | VERMEJO COAL | 1641 ft. | 1986 ft. | N | N | | TRINIDAD | 1986 ft. | 2155 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 1/27/2005 Interval Top: 1675 ft. Interval Bottom: 1951 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 9/29/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/17/2005 | | Treatment Summary: | NEW PERFS FR/1950'-1951', 1940'-1941', 1925-1926', 1908'-1910;, 1766'-1768', 1753'-1754', 1692'-1693' & 1675'-1676'. ACIDIZED W/1,000 GALS 15% HCL ACID. REFRAC'D W/112,302 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 41,000# 16/30 BRADY SD & CONT NEXT PG |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2022 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 151 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 151 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 1 | | MCF_GAS | 0 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 1675 ft. | # Of Holes: | 120 | | Interval Bottom: | 1951 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: SI - 2/1/2025 Interval Top: 644 ft. Interval Bottom: 1951 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 3/25/2010 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/25/2001 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1999 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/27/2010 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | BBLS_OIL | 0 | | BTU_GAS | 1008 | | CALC_BBLS_H2O | 112 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 6 | | MCF_GAS | 0 | | TUBING_PRESS | 15 |
| | Perforation Data: | | Interval Top: | 644 ft. | # Of Holes: | 191 | | Interval Bottom: | 1951 ft. | Hole Size: | 0.45 in. |
|
Formation RTON Formation Classification: GW Status: CM - 3/27/2010 Interval Top: 644 ft. Interval Bottom: 939 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 3/25/2010 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2010 | | Treatment Summary: | ACIDIZED W/3,550 GALS 15% HCL ACID. REFRAC'D W/168,937 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 26, 880# 16/30 BRADY SD & 361,740" 12/20 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 644 ft. | # Of Holes: | 71 | | Interval Bottom: | 939 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3913 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.825 |
| Average MCFE per Day | 10.581 |
| Federal Financial Assurance | i | |
|
|