Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07405
Well Classification: CBM Status: PA - 6/27/2023
Well Name/No:APACHE CANYON #18-04V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/27/2023
FacilityID:260235LocationID:308023
County:LAS ANIMAS #071Location:NWNW 18 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7838 ft.
Planned Location:1012FNL  946 FWLLat/Long: 37.088823 / -104.934431Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.088710 / -104.934370Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/8/2011
End Date: 7/8/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 283
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: AB - 6/27/2023             Measured TD: 2155 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        AB - 6/27/2023
Wellbore Permit
Permit #:011048 Expiration Date:5/27/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/28/2001
Spud Date:7/15/2001Spud Date Is:ACTUAL
Measured TD:2155 ft.Measured PB depth:2146 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 272 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 271 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2140 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 600 ft., Bottom: 2140 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 5.5 in., Top: , Depth: 600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 74, Top: 0 ft., Bottom: 600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1645 ft.NN
VERMEJO COAL1645 ft.2012 ft.NN
TRINIDAD2012 ft.2155 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/7/2001                  Interval Top: 1739 ft.    Interval Bottom: 1881 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:20N - 095 P C PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:8/28/2001
Treatment Summary:SEE SCANNED DOC# 1335950
Tubing Size:2.875 in.Tubing Setting Depth:1714 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2001Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 177
BBLS_OIL 0
CALC_BBLS_H2O 177
CALC_BBLS_OIL 0
CALC_MCF_GAS 5
MCF_GAS 5
Perforation Data:
Interval Top:1739 ft.# Of Holes:64
Interval Bottom:1881 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 6/27/2023                 Interval Top: 547 ft.    Interval Bottom: 1881 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2001 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/4/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BTU_GAS 991
CALC_BBLS_H2O 18
CALC_MCF_GAS 66
CASING_PRESS 5
MCF_GAS 66
TUBING_PRESS 3
Perforation Data:
Interval Top:547 ft.# Of Holes:120
Interval Bottom:1881 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/24/2011                 Interval Top: 547 ft.    Interval Bottom: 870 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/3/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/8/2011
Treatment Summary:Acidized w/2,200 gals 15% HCl acid. Frac'd w/81,522 gals 20# Delta 140 w/Sandwedge OS carrying 267,727# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:547 ft.# Of Holes:56
Interval Bottom:870 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/27/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No