|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/8/2002 Measured TD: 2085 ft. Vertical TD: 2085 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/8/2002 | Wellbore Permit | | Permit #: | 20011017 | Expiration Date: | 5/21/2002 | Proposed Depth/Form: | 2240 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 11/7/2001 | Spud Date: | 10/12/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2085 ft. | Measured PB depth: | 1993 ft. | True Vertical TD: | 2085 ft. | True Vertical PB depth: | 1993 ft. | Log Types: | ARRAY INDUCTION, ENLD, CBL AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 224 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 75, Top: 0 ft., Bottom: 224 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2016 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 234, Top: 0 ft., Bottom: 1987 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1399 ft. | N | N | VERMEJO COAL | 1538 ft. | 1832 ft. | N | N | TRINIDAD | 1835 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 1/8/2002 Interval Top: 904 ft. Interval Bottom: 1825 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 11/8/2001 | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/7/2001 | Treatment Summary: | 10/30/01 PUMPED 1,000 GALS OF 7.5% HCL ACID; 120 BIO BALLS; 1,043,000 SCF N2 W/ 137,140# OF 16/30 MESH SAND AT 16 BPM (STAGE 1THRU STAGE 3) THRU 88 HOLES 904' - 1,825'. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1895 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/8/2001 | Test Method: | PUMPING FLOW | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 0 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 904 ft. | # Of Holes: | 88 | Interval Bottom: | 1825 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 7128 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 3.373 |
Average MCFE per Day | 19.528 |
Federal Financial Assurance | i | |
|
|