Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07398
Well Classification: CBM Status: PR - 11/27/2001
Well Name/No:VPR C #74
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/27/2001
FacilityID:260183LocationID:308016
County:LAS ANIMAS #071Location:SESE 23 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7657 ft.
Planned Location:1128FSL  1147 FELLat/Long: 37.066015 / -104.743665Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.066010 / -104.743660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/27/2001             Measured TD: 2170 ft.    Vertical TD: 2170 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/27/2001
Wellbore Permit
Permit #:20011015 Expiration Date:5/21/2002
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/7/2001
Spud Date:10/18/2001Spud Date Is:ACTUAL
Measured TD:2170 ft.Measured PB depth:2095 ft.
True Vertical TD:2170 ft.True Vertical PB depth:2095 ft.
Log Types:ARRAY INDUCTION, EPITHERMAL NTRN LITHO DENS., CBL, & MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 224 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 224 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2110 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 329, Top: 1084 ft., Bottom: 2089 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 42 ft., Bottom: 1080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1499 ft.NN
VERMEJO COAL1642 ft.1925 ft.NN
TRINIDAD1935 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/27/2001                Interval Top: 998 ft.    Interval Bottom: 1918 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/27/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/7/2001
Treatment Summary:11/3/01: PUMPED 1,250 GALS OF 7.5% ACID; 931,740 SCF N2 W/188,220# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 5) THRU 108 HOLES 998'-1918'.
Tubing Size:2.875 in.Tubing Setting Depth:1963 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/27/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
CALC_BBLS_H2O 93
CALC_MCF_GAS 48
CASING_PRESS 60
MCF_GAS 48
Perforation Data:
Interval Top:998 ft.# Of Holes:108
Interval Bottom:1918 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24998
GOR
GOR DeterminationMCFE
Average BOE per Day11.808
Average MCFE per Day68.473

 Federal Financial Assurance  i 

 Tribal Well  i No