Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07394
Well Classification: CBM Status: PR - 11/18/2001
Well Name/No:VPR C #81
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/18/2001
FacilityID:260178LocationID:308012
County:LAS ANIMAS #071Location:SWSW 14 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7539 ft.
Basin:RATON BASIN  
Planned Location:823FSL  987 FWLLat/Long: 37.079674 / -104.754435Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.079660 / -104.754430Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/18/2001             Measured TD: 2110 ft.    Vertical TD: 2110 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/18/2001
Wellbore Permit
Permit #:20011011 Expiration Date:5/21/2002
Proposed Depth/Form:2280 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/14/2001
Spud Date:10/15/2001Spud Date Is:ACTUAL
Measured TD:2110 ft.Measured PB depth:1922 ft.
True Vertical TD:2110 ft.True Vertical PB depth:1922 ft.
Log Types:ARRAY INDUCTION,ENLD, CBL AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2081 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 313, Top: 0 ft., Bottom: 2055 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1452 ft.NN
VERMEJO COAL1582 ft.1862 ft.NN
TRINIDAD1874 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/18/2001                Interval Top: 903 ft.    Interval Bottom: 1862 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING CBM GAS WELL, PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2001
Treatment Summary:11/02/01 PUMPED 1,050 GALS OF 7.5% HCL ACID, 152 BIO BALLS, 954,617 SCF N2 WITH 102,380 LBS OF 16/30 MESH SAND AT 16 BPM ( STAGE 1 THRU STAGE 5) THRU 104 HOLES 903'-1862'.
Tubing Size:2.875 in.Tubing Setting Depth:1922 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2001Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
BBLS_OIL 0
CALC_BBLS_H2O 85
CALC_BBLS_OIL 0
CALC_MCF_GAS 22
CASING_PRESS 28
MCF_GAS 22
Perforation Data:
Interval Top:903 ft.# Of Holes:104
Interval Bottom:1862 ft.Hole Size:

Sidetrack #01             Wellbore Classification: CBM             Status: PR - 11/18/2001             Measured TD: 3791 ft.    Vertical TD: 1853 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: CBM        PR - 11/18/2001
Wellbore PermitHORIZONTAL
Permit #:20050684 Expiration Date:3/30/2006
Proposed Top PZ Location:Sec: Twp: Footage: 987 FWL  823 FSL
Bottom Hole Location:Sec: Twp: Footage: 2590 FWL  2485 FSL
Proposed Depth/Form:4040 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/29/2005
Spud Date:6/6/2005Spud Date Is:ACTUAL
Measured TD:3791 ft.Measured PB depth:2056 ft.
True Vertical TD:1853 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 918 FSL  1147 FWL
Bottom Hole Location:Sec: Twp: Footage: 2271 FSL  2449 FWL
Log Types:MWD LOG
Casing:String Type: 1ST LINER, Hole Size: 4.75 in., Size: 3.5 in., Top: 1748 ft., Depth: 3502 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL2035 ft.3791 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/29/2005                 Interval Top: 1748 ft.    Interval Bottom: 3502 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:6/29/2005Choke Size:0.141 in.
Formation Name:VERMEJO COALCommingled:Yes
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:6/29/2005
Treatment Summary:SEE SCANNED DOC#1423656
Tubing Size:2.875 in.Tubing Setting Depth:1903 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/29/2005Test Method:PUMPING
Hours Tested:Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 380
CASING_PRESS 20
MCF_GAS 37
Perforation Data:
Interval Top:1748 ft.# Of Holes:
Interval Bottom:3502 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  CM - 11/18/2001                Interval Top: 903 ft.    Interval Bottom: 1862 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/18/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/29/2005
Treatment Summary:SEE SCANNED DOC# 01078109
Tubing Size:2.875 in.Tubing Setting Depth:1922 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2001Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
CALC_BBLS_H2O 85
CALC_MCF_GAS 22
CASING_PRESS 28
MCF_GAS 22
Perforation Data:
Interval Top:903 ft.# Of Holes:104
Interval Bottom:1862 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22860
GOR
GOR DeterminationMCFE
Average BOE per Day10.796
Average MCFE per Day62.626

 Federal Financial Assurance  i 

 Tribal Well  i No