|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/18/2001 Measured TD: 2110 ft. Vertical TD: 2110 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/18/2001 | | Wellbore Permit | | | Permit #: | 20011011 | Expiration Date: | 5/21/2002 | | Proposed Depth/Form: | 2280 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/14/2001 | | Spud Date: | 10/15/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2110 ft. | Measured PB depth: | 1922 ft. | | True Vertical TD: | 2110 ft. | True Vertical PB depth: | 1922 ft. | | Log Types: | ARRAY INDUCTION,ENLD, CBL AND MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2081 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 313, Top: 0 ft., Bottom: 2055 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1452 ft. | N | N | | VERMEJO COAL | 1582 ft. | 1862 ft. | N | N | | TRINIDAD | 1874 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 11/18/2001 Interval Top: 903 ft. Interval Bottom: 1862 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | PUMPING CBM GAS WELL, PRODUCED WATER INJECTED IN WDW. | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/14/2001 | | Treatment Summary: | 11/02/01 PUMPED 1,050 GALS OF 7.5% HCL ACID, 152 BIO BALLS, 954,617 SCF N2 WITH 102,380 LBS OF 16/30 MESH SAND AT 16 BPM ( STAGE 1 THRU STAGE 5) THRU 104 HOLES 903'-1862'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1922 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/18/2001 | Test Method: | PUMPING FLOW | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 85 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 85 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 28 | | MCF_GAS | 22 |
| | Perforation Data: | | Interval Top: | 903 ft. | # Of Holes: | 104 | | Interval Bottom: | 1862 ft. | Hole Size: | |
|
Sidetrack #01 Wellbore Classification: CBM Status: PR - 11/18/2001 Measured TD: 3791 ft. Vertical TD: 1853 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: CBM PR - 11/18/2001 | | Wellbore Permit | HORIZONTAL | | Permit #: | 20050684 | Expiration Date: | 3/30/2006 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 987 FWL 823 FSL | | Bottom Hole Location: | Sec: Twp: | Footage: 2590 FWL 2485 FSL | | Proposed Depth/Form: | 4040 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/29/2005 | | Spud Date: | 6/6/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 3791 ft. | Measured PB depth: | 2056 ft. | | True Vertical TD: | 1853 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 918 FSL 1147 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 2271 FSL 2449 FWL | | Log Types: | MWD LOG | | Casing: | String Type: 1ST LINER, Hole Size: 4.75 in., Size: 3.5 in., Top: 1748 ft., Depth: 3502 ft., Weight: 9.3 , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | VERMEJO COAL | 2035 ft. | 3791 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 6/29/2005 Interval Top: 1748 ft. Interval Bottom: 3502 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 6/29/2005 | Choke Size: | 0.141 in. | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2005 | | Treatment Summary: | SEE SCANNED DOC#1423656 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1903 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/29/2005 | Test Method: | PUMPING | | Hours Tested: | | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 380 | | CASING_PRESS | 20 | | MCF_GAS | 37 |
| | Perforation Data: | | Interval Top: | 1748 ft. | # Of Holes: | | | Interval Bottom: | 3502 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: CM - 11/18/2001 Interval Top: 903 ft. Interval Bottom: 1862 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 11/18/2001 | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2005 | | Treatment Summary: | SEE SCANNED DOC# 01078109 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1922 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/18/2001 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 85 | | CALC_BBLS_H2O | 85 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 28 | | MCF_GAS | 22 |
| | Perforation Data: | | Interval Top: | 903 ft. | # Of Holes: | 104 | | Interval Bottom: | 1862 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 22860 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 10.796 |
| Average MCFE per Day | 62.626 |
| Federal Financial Assurance | i | |
|
|