Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07393
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #82
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:260176LocationID:308011
County:LAS ANIMAS #071Location:SWSE 14 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7523 ft.
Basin:RATON BASIN  
Planned Location:694FSL  1534 FELLat/Long: 37.079324 / -104.745325Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.079320 / -104.745330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2075 ft.    Vertical TD: 2075 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20011010 Expiration Date:5/21/2002
Proposed Depth/Form:2220 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/20/2001
Spud Date:10/16/2001Spud Date Is:ACTUAL
Measured TD:2075 ft.Measured PB depth:1890 ft.
True Vertical TD:2075 ft.True Vertical PB depth:1890 ft.
Log Types:AI, ENLD, CBL AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 222 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 222 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2036 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 1498 ft., Bottom: 2008 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1498 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 228, Top: 78 ft., Bottom: 1498 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1432 ft.NN
VERMEJO COAL1554 ft.1822 ft.NN
TRINIDAD1835 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 746 ft.    Interval Bottom: 1822 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/21/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING CBM GAS WELL, PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2001
Treatment Summary:11-03-01 PUMPED 650 GALS OF 7.5% HCL ACID, 754,000 SCF N2 WITH 115,590 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 60 THRU 76 HOLES 746' - 1,822'.
Tubing Size:2.875 in.Tubing Setting Depth:1890 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2001Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 82
CALC_BBLS_H2O 82
CALC_MCF_GAS 28
CASING_PRESS 35
MCF_GAS 28
Perforation Data:
Interval Top:746 ft.# Of Holes:76
Interval Bottom:1822 ft.Hole Size:0.51 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)1758
GOR
GOR DeterminationMCFE
Average BOE per Day0.827
Average MCFE per Day4.800

 Federal Financial Assurance  i 

 Tribal Well  i No