Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07393
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #82
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:260176LocationID:308011
County:LAS ANIMAS #071Location:SWSE 14 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7523 ft.
Planned Location:694FSL  1534 FELLat/Long: 37.079324 / -104.745325Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.079320 / -104.745330Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2075 ft.    Vertical TD: 2075 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20011010 Expiration Date:5/21/2002
Proposed Depth/Form:2220 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/20/2001
Spud Date:10/16/2001Spud Date Is:ACTUAL
Measured TD:2075 ft.Measured PB depth:1890 ft.
True Vertical TD:2075 ft.True Vertical PB depth:1890 ft.
Log Types:AI, ENLD, CBL AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 222 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 222 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2036 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 1498 ft., Bottom: 2008 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1498 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 228, Top: 78 ft., Bottom: 1498 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1432 ft.NN
VERMEJO COAL1554 ft.1822 ft.NN
TRINIDAD1835 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 746 ft.    Interval Bottom: 1822 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/21/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING CBM GAS WELL, PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2001
Treatment Summary:11-03-01 PUMPED 650 GALS OF 7.5% HCL ACID, 754,000 SCF N2 WITH 115,590 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 60 THRU 76 HOLES 746' - 1,822'.
Tubing Size:2.875 in.Tubing Setting Depth:1890 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2001Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 82
CALC_BBLS_H2O 82
CALC_MCF_GAS 28
CASING_PRESS 35
MCF_GAS 28
Perforation Data:
Interval Top:746 ft.# Of Holes:76
Interval Bottom:1822 ft.Hole Size:0.51 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)479
GOR
GOR DeterminationMCFE
Average BOE per Day0.229
Average MCFE per Day1.324

 Federal Financial Assurance  i 

 Tribal Well  i No