|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/1/2025 Measured TD: 2075 ft. Vertical TD: 2075 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20011010 | Expiration Date: | 5/21/2002 | | Proposed Depth/Form: | 2220 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/20/2001 | | Spud Date: | 10/16/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2075 ft. | Measured PB depth: | 1890 ft. | | True Vertical TD: | 2075 ft. | True Vertical PB depth: | 1890 ft. | | Log Types: | AI, ENLD, CBL AND MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 222 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 222 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2036 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 1498 ft., Bottom: 2008 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1498 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 228, Top: 78 ft., Bottom: 1498 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1432 ft. | N | N | | VERMEJO COAL | 1554 ft. | 1822 ft. | N | N | | TRINIDAD | 1835 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 5/1/2025 Interval Top: 746 ft. Interval Bottom: 1822 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 11/21/2001 | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | PUMPING CBM GAS WELL, PRODUCED WATER INJECTED IN WDW. | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/20/2001 | | Treatment Summary: | 11-03-01 PUMPED 650 GALS OF 7.5% HCL ACID, 754,000 SCF N2 WITH 115,590 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 60 THRU 76 HOLES 746' - 1,822'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1890 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/21/2001 | Test Method: | PUMPING FLOW | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 82 | | CALC_BBLS_H2O | 82 | | CALC_MCF_GAS | 28 | | CASING_PRESS | 35 | | MCF_GAS | 28 |
| | Perforation Data: | | Interval Top: | 746 ft. | # Of Holes: | 76 | | Interval Bottom: | 1822 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1758 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.827 |
| Average MCFE per Day | 4.800 |
| Federal Financial Assurance | i | |
|
|