Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07388
Well Classification: CBM Status: PR - 11/10/2004
Well Name/No:VPR C #65
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/10/2004
FacilityID:260127LocationID:308006
County:LAS ANIMAS #071Location:NESW 26 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7631 ft.
Basin:RATON BASIN  
Planned Location:1372FSL  2291 FWLLat/Long: 37.052185 / -104.749965Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.052180 / -104.749960Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/22/2011
End Date: 2/22/2011
Reported: 7/13/2011
Prior to rule 205A.b.(2)(A)
Days to report: 141
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/6/2001             Measured TD: 2125 ft.    Vertical TD: 2125 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/6/2001
Wellbore Permit
Permit #:20010973 Expiration Date:5/16/2002
Proposed Depth/Form:2300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/14/2001
Spud Date:10/5/2001Spud Date Is:ACTUAL
Measured TD:2125 ft.Measured PB depth:2088 ft.
True Vertical TD:2125 ft.True Vertical PB depth:2088 ft.
Log Types:ARRAY INDUCTION, ENLD, CBL & MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 226 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2090 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 2073 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1499 ft.NN
VERMEJO COAL1600 ft.1877 ft.NN
TRINIDAD1883 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/6/2001                 Interval Top: 912 ft.    Interval Bottom: 1871 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/6/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:10/23/2011
Treatment Summary:PUMPED 1,250 GALS OF 30# LINEAR GEL ACID, 1,050 GALS OF 7.5% HCL ACID, 844.112 SCF N2 WITH 149,500 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 6) THRU 92 HOLES 912'-1871'.
Formation Treatment
Treatment Date:11/10/2004
Treatment Summary:CUT WINDOW IN 5 1/2" CASING FROM 1699'-1705'. DRILLED HORIZONTAL LATERAL IN BASAL VERMEJO COAL TO 3560' TMD. RETRIEVED WHIP STOCK AND RBP. RAN 3 1/2" PERFORATED LINER & PRODUCTION EQUIPMENT BACK IN HOLE. PUT BACK ON PRODUCTION
Tubing Size:2.875 in.Tubing Setting Depth:1918 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/6/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:912 ft.# Of Holes:92
Interval Bottom:1871 ft.Hole Size:0.51 in.

Sidetrack #01             Wellbore Classification: CBM             Status: PR - 11/10/2004             Measured TD: 3560 ft.    Vertical TD: 1900 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: CBM        PR - 11/10/2004
Wellbore PermitHORIZONTAL
Permit #:20042006 Expiration Date:9/2/2005
Proposed Top PZ Location:Sec:26 Twp: 34S 66W Footage: 1372 FSL  2291 FWL
Bottom Hole Location:Sec:26 Twp: 34S 66W Footage: 2630 FSL  10 FWL
Proposed Depth/Form:2090 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/22/2004
Spud Date:10/14/2004Spud Date Is:ACTUAL
Measured TD:3560 ft.Measured PB depth:2088 ft.
True Vertical TD:1900 ft.True Vertical PB depth:
Bottom Hole Location:Sec:26 Twp: 34S 66WFootage: 2630 FSL  10 FWL
Log Types:MEASUEMENT WHILE DRILLING LOG
Casing:String Type: 1ST LINER, Hole Size: 4.75 in., Size: 3.5 in., Top: 1730 ft., Depth: 3540 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1993 ft.3560 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  CM - 11/10/2004                Interval Top: 1833 ft.    Interval Bottom: 3550 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/6/2001Choke Size:0.203 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/22/2004
Treatment Summary:SEE SCANNED DOCUMENT 01417396
Tubing Size:2.875 in.Tubing Setting Depth:1954 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/10/2004Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
CASING_PRESS 40
MCF_GAS 23
Perforation Data:
Interval Top:1833 ft.# Of Holes:
Interval Bottom:3550 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)35371
GOR
GOR DeterminationMCFE
Average BOE per Day16.711
Average MCFE per Day96.933

 Federal Financial Assurance  i 

 Tribal Well  i No