|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/6/2001 Measured TD: 2075 ft. Vertical TD: 2075 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/6/2001 | | Wellbore Permit | | | Permit #: | 20010970 | Expiration Date: | 5/16/2002 | | Proposed Depth/Form: | 2230 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/15/2001 | | Spud Date: | 10/4/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2075 ft. | Measured PB depth: | 2033 ft. | | True Vertical TD: | 2075 ft. | True Vertical PB depth: | 2033 ft. | | Log Types: | ARRAY INDUCTION, ENLD, CBL & MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 227 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 227 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2038 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 2019 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 98 ft. | N | N | | VERMEJO COAL | 1571 ft. | 1827 ft. | N | N | | TRINIDAD | 1834 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 11/6/2001 Interval Top: 869 ft. Interval Bottom: 1822 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 11/6/2001 | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/15/2001 | | Treatment Summary: | 10/20/2001 PUMPED 2,000 GALS OF 30# LINEAR GEL; 1,150 GALS OF 7.5% HCL ACID, 1,170,788 SCF N2 W/ 167,380# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 9) THRU 132 HOLES 869' - 1822'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1869 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/6/2001 | Test Method: | FLOW | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 171 | | CALC_BBLS_H2O | 171 | | CALC_MCF_GAS | 28 | | CASING_PRESS | 35 | | MCF_GAS | 28 |
| | Perforation Data: | | Interval Top: | 869 ft. | # Of Holes: | 132 | | Interval Bottom: | 1822 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20418 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 9.644 |
| Average MCFE per Day | 55.955 |
| Federal Financial Assurance | i | |
|
|