|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/24/2006 Measured TD: 2560 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/24/2006 | | Wellbore Permit | | | Permit #: | 20010902 | Expiration Date: | 5/7/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2001 | | Spud Date: | 6/20/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2560 ft. | Measured PB depth: | 2537 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 55, Top: 0 ft., Bottom: 215 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2539 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 2539 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2180 ft. | N | N | | VERMEJO COAL | 2180 ft. | 2486 ft. | N | N | | TRINIDAD | 2486 ft. | 2560 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 8/15/2001 Interval Top: 2199 ft. Interval Bottom: 2442 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 8/9/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMPING(30NO095-PC) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/29/2001 | | Treatment Summary: | COBRA FRAC W/ PERFORATIONS: 2426'-34', 2439'-42' (4 SPF, 44 HOLES) FRAC 1ST STAGE: 14,638 FRAC FLUID INC. PAD, 49,100# 16/30 BRADY, 390,333 SCF NC, DELTA FOAM PERFORATIONS: 2347'-50', 2359'-62', 2369'-71' (4 SPF. 32 HOLES) FRAC 2ND STAGE: 4,361 FRAC FLUID INC. PAD, 16,250# 16/30 BRADY, 111,392 SCF N2, PERFORATIONS: 2263'-67', 2276'-79', 2281'-88' (4 SPF, 56 HOLES) FRAC 3RD STAGE: 12,452 FRAC FLUID INC. PAD, 49,570# 16/30 BRADY, 358,657 SCF N2, PERFORATIONS: 2199'-06' (4 SPF, 56 HOLES) FRAC 4TH STAGE: 4,299 FRAC FLUID INC. PAD, 17,490# 16/30 BRADY, 129,486 SCF N2, |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2464 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/9/2001 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 136 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 136 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 25 | | MCF_GAS | 2 |
| | Perforation Data: | | Interval Top: | 2199 ft. | # Of Holes: | 188 | | Interval Bottom: | 2442 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 12/24/2006 Interval Top: 637 ft. Interval Bottom: 1484 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 12/23/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/11/2006 | | Treatment Summary: | ACIDIZED W/3250GALS 15% HCI ACID. FRAC'D W/ 161,146 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 19,000# 16/30 & 337,902# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1589 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/24/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | BBLS_OIL | 0 | | BTU_GAS | 968.9 | | CALC_BBLS_H2O | 92 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 0 | | GRAVITY_OIL | 0.576 | | MCF_GAS | 0 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 637 ft. | # Of Holes: | 67 | | Interval Bottom: | 1484 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 12/24/2006| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 12/24/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 12700 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 5.996 |
| Average MCFE per Day | 34.786 |
| Federal Financial Assurance | i | |
|
|