|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/1/2025 Measured TD: 2778 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/1/2025 | Wellbore Permit | | Permit #: | 20031709 | Expiration Date: | 9/14/2004 | Proposed Depth/Form: | 2778 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 8/4/2001 | Spud Date: | 6/10/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2778 ft. | Measured PB depth: | 2775 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL,SIL,CBL(2) | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 382 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 0 ft., Bottom: 382 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2762 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 1046 ft., Bottom: 2762 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 97, Top: 0 ft., Bottom: 780 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: , Depth: 962 ft., Bottom: , Sacks: 80, Method: PERF & PUMP | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2312 ft. | N | N | VERMEJO COAL | 2312 ft. | 2640 ft. | N | N | TRINIDAD | 2640 ft. | 2785 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 2/6/2003 Interval Top: 2336 ft. Interval Bottom: 2550 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 8/3/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING (30NO095-PC) | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/1/2001 | Treatment Summary: | DELTA FRAC 140 20# PERFORATIONS: 2546'-2550' (4 SPF. 16 HOLES) FRAC 1ST STAGE: 11,988 GAL PAD, 33,250# 16/30 BRADY, 249,400 SCF N2, PERFORATIONS: 2483'-86' (4 SPF, 12 HOLES) FRAC 2ND STAGE: 7,473 GAL PAD, 16,875# 16/30 BRADY, 127,300 SCF N2 PERFORATIONS: 2396'-06',2410'-12' (4 SPF, 48 HOLES) FRAC 3RD STAGE: 14,068 GAL PAD, 41,500# 16/30 BRADY, 301,700 SCF N2 PERFORATIONS: 2336'-39' (4 SPF, 12 HOLES) FRAC 4TH STAGE: 5,136 GAL PAD, 8,438# 16/30 BRADY, 63,800 SCF N2 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2400 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/3/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 191 | BBLS_OIL | 0 | BTU_GAS | 1000 | CALC_BBLS_H2O | 191 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 6 | CASING_PRESS | 25 | MCF_GAS | 6 |
| Perforation Data: | Interval Top: | 2336 ft. | # Of Holes: | 88 | Interval Bottom: | 2550 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 4/27/2007 Interval Top: 695 ft. Interval Bottom: 1671 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 4/26/2007 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/12/2007 | Treatment Summary: | ACIDIZED W/ 2000 GALS 15% HCI ACID FRAC'D W/ 138,193 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 14,780# 16/30 AND 133,634# 12/20 BRADY SAND |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1765 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/27/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 93 | BBLS_OIL | 0 | BTU_GAS | 987.6 | CALC_BBLS_H2O | 93 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 3 | MCF_GAS | 0 | TUBING_PRESS | 6 |
| Perforation Data: | Interval Top: | 695 ft. | # Of Holes: | 84 | Interval Bottom: | 1671 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 7/1/2025 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 4/26/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 07/2024 - 06/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 2860 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 1.351 |
Average MCFE per Day | 7.824 |
Federal Financial Assurance | i | |
|
|