Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07362
Well Classification: CBM Status: PR - 8/15/2010
Well Name/No:HILL RANCH #17-03V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2010
FacilityID:260027LocationID:307996
County:LAS ANIMAS #071Location:NENW 17 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8352 ft.
Basin:RATON BASIN  
Planned Location:1296FNL  1783 FWLLat/Long: 37.001035 / -104.914159Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.001000 / -104.914110Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/15/2010             Measured TD: 2725 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/15/2010
Wellbore Permit
Permit #:20010885 Expiration Date:5/6/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/25/2001
Spud Date:5/30/2001Spud Date Is:ACTUAL
Measured TD:2725 ft.Measured PB depth:2720 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 423 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 423 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2670 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 220 ft., Bottom: 2670 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2266 ft.NN
VERMEJO COAL2266 ft.2570 ft.NN
TRINIDAD2570 ft.2725 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/19/2002                 Interval Top: 2267 ft.    Interval Bottom: 2512 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:7/19/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:6/25/2001
Treatment Summary:SEE SCANNED DOC.# 01098304
Tubing Size:2.875 in.Tubing Setting Depth:2528 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 105
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 105
CALC_MCF_GAS 77
CASING_PRESS 25
MCF_GAS 77
Perforation Data:
Interval Top:2267 ft.# Of Holes:104
Interval Bottom:2512 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/15/2010                 Interval Top: 591 ft.    Interval Bottom: 2512 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/12/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:2600 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 42
BTU_GAS 999
CALC_BBLS_H2O 42
CALC_MCF_GAS 308
CASING_PRESS 42
MCF_GAS 308
TUBING_PRESS 4
Perforation Data:
Interval Top:591 ft.# Of Holes:180
Interval Bottom:2512 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 591 ft.    Interval Bottom: 1593 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/12/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/26/2010
Treatment Summary:Acidized w/3,800 gals 15% HCl acid. Frac'd w/170,128 gals 20# Delta 140 carrying 24,100# 16/30 Brady sd & 338,500# 12/20 Brady sd (177,100# 12/20 Brady sd coated w/Expedite 225).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:591 ft.# Of Holes:76
Interval Bottom:1593 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)31547
GOR
GOR DeterminationMCFE
Average BOE per Day14.896
Average MCFE per Day86.418

 Federal Financial Assurance  i 

 Tribal Well  i No