Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07361
Well Classification: CBM Status: SI - 11/1/2025
Well Name/No:HILL RANCH #25-05V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:260024LocationID:307995
County:LAS ANIMAS #071Location:SWNW 25 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7538 ft.
Basin:RATON BASIN  
Planned Location:2225FNL  1212 FWLLat/Long: 37.056364 / -104.843778Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.056290 / -104.843710Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 11/1/2025             Measured TD: 2065 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 11/1/2025
Wellbore Permit
Permit #:010882 Expiration Date:5/3/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/19/2001
Spud Date:5/24/2002Spud Date Is:ACTUAL
Measured TD:2065 ft.Measured PB depth:2062 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 513 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 513 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2043 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 2043 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1595 ft.NN
VERMEJO COAL1595 ft.1896 ft.NN
TRINIDAD1896 ft.2065 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/22/2013                Interval Top: 1596 ft.    Interval Bottom: 1899 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2006
Treatment Summary:ACIDIZED W/1500 GALS 15% HCI ACID. FRACD W/143,378 GALS 20# DELTA 140 W/20,300 GALS 20# DELTA 140 CARRYING 251,732# 12/20 BRADY SAND.
Formation Treatment
Treatment Date:4/25/2006
Treatment Summary:2006 Status Change that was incorrectly submitted.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 94
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 94
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 12
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:1596 ft.# Of Holes:124
Interval Bottom:1899 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 11/1/2025                 Interval Top: 558 ft.    Interval Bottom: 1899 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/18/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/23/2013Treatment End Date:N/A
Treatment Summary:10/13/2006 Drilled out CIBP set @ 1200'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:1941 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:558 ft.# Of Holes:166
Interval Bottom:1899 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/22/2013                Interval Top: 558 ft.    Interval Bottom: 1011 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/3/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2006
Treatment Summary:ACIDIZED W/1500 GALS 15% HCI ACID. FRAC'D W/148,378 GALS 20# DELTA 140 W/20,300 GALS 20# DELTA 140 CARRYING 251,732# 12/20 BRADY SAND.
Formation Treatment
Treatment Date:5/3/2006
Treatment Summary:A. w/1500 gals 15% HCl acid. Frac'd w/143,378 gals 20# Delta 140 w/sandwedge NT carrying 20,300# 16/30 & 251,732# 12/20 Brady sands.
Tubing Size:2.875 in.Tubing Setting Depth:1083 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/5/2006Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 94
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 94
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 12
GRAVITY_OIL 1
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:558 ft.# Of Holes:42
Interval Bottom:1011 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24720
GOR
GOR DeterminationMCFE
Average BOE per Day11.682
Average MCFE per Day67.739

 Federal Financial Assurance  i 

 Tribal Well  i No