|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/1/2010 Measured TD: 2365 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/1/2010 | | Wellbore Permit | | | Permit #: | 010880 | Expiration Date: | 5/3/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/27/2001 | | Spud Date: | 5/16/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2365 ft. | Measured PB depth: | 2360 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, ACBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 816 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 816 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2347 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 392, Top: 72 ft., Bottom: 2347 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1872 ft. | N | N | | VERMEJO COAL | 1872 ft. | 2193 ft. | N | N | | TRINIDAD | 2193 ft. | 2365 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 9/9/2006 Interval Top: 2122 ft. Interval Bottom: 2146 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 12/31/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/24/2006 | | Treatment Summary: | RE-FRAC'D VRMJ COAL ACIDIZING W/800 GALS 15% HCI ACID. FRAC'D W/56,329 GALS 203 DELTA 140 W/SANDWEDGE NT CARRYING 87,927# 16/30 BRADY SD. ORIGINAL PERFS FOR VMRJ COAL WERE 1880' - 2176'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/9/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 0 | | BTU_GAS | 990 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 15 | | GRAVITY_OIL | 1 | | MCF_GAS | 30 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 2122 ft. | # Of Holes: | 24 | | Interval Bottom: | 2146 ft. | Hole Size: | 0.4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 9/9/2006 Interval Top: 853 ft. Interval Bottom: 1854 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 9/8/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2006 | | Treatment Summary: | ACIDIZED W/2700 GALS 15% HCI ACID. FRAC'D W/216,690 GALS 20# DELTA 140 FRAC W/SANDWEDGE NT CARRYING 367,977# 12/20 BRADY SD&30,000# 12/20 SLC SD AND 24,600# 16/30 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1430 ft. | | Tubing Packer Depth: | 1 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/9/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BTU_GAS | 990 | | CALC_BBLS_H2O | 32 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 15 | | GRAVITY_OIL | 1 | | MCF_GAS | 30 | | TUBING_PRESS | 6 |
| | Perforation Data: | | Interval Top: | 853 ft. | # Of Holes: | 96 | | Interval Bottom: | 1854 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 12/1/2010| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 9/8/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 26067 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 12.307 |
| Average MCFE per Day | 71.400 |
| Federal Financial Assurance | i | |
|
|