|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/2/2006 Measured TD: 2291 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/2/2006 | | Wellbore Permit | | | Permit #: | 010878 | Expiration Date: | 5/3/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/29/2001 | | Spud Date: | 5/23/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2291 ft. | Measured PB depth: | 2285 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL. SIL,CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 722 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2262 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 2262 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1807 ft. | N | N | | VERMEJO COAL | 1807 ft. | 2130 ft. | N | N | | TRINIDAD | 2130 ft. | 2291 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/30/2005 Interval Top: 1886 ft. Interval Bottom: 2096 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/29/2001 | | Treatment Summary: | ACIDIZED W/1000 GALS 15% HCL ACID. FRAC'D W/142,730 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 34,800# 16/30 & 184,703# 12/20 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/30/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 96 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 240 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 4 | | CASING_PRESS | 0 | | MCF_GAS | 0 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 1886 ft. | # Of Holes: | 32 | | Interval Bottom: | 2096 ft. | Hole Size: | 0.4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 10/2/2006 Interval Top: 801 ft. Interval Bottom: 1253 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 10/1/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/18/2006 | | Treatment Summary: | ACIDIZED W/3000 GALS 15% HCL ACID. FRAC'D W/161,184 GALS 20# DELTA 140 W/SANDWEDGE CARRYING 18,400# 16/30 AND 261,612# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1341 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/2/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 0 | | BTU_GAS | 1003 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 9 | | CASING_PRESS | 4 | | GRAVITY_OIL | 1 | | MCF_GAS | 9 | | TUBING_PRESS | 1 |
| | Perforation Data: | | Interval Top: | 801 ft. | # Of Holes: | 57 | | Interval Bottom: | 1253 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/2/2006| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 10/1/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 24097 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 11.382 |
| Average MCFE per Day | 66.009 |
| Federal Financial Assurance | i | |
|
|