Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07357
Well Classification: CBM Status: PR - 10/2/2006
Well Name/No:HILL RANCH #26-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/2/2006
FacilityID:260020LocationID:307993
County:LAS ANIMAS #071Location:SWNE 26 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7751 ft.
Planned Location:1498FNL  1601 FELLat/Long: 37.058384 / -104.853408Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.058310 / -104.853390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/2/2006             Measured TD: 2291 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/2/2006
Wellbore Permit
Permit #:010878 Expiration Date:5/3/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/29/2001
Spud Date:5/23/2002Spud Date Is:ACTUAL
Measured TD:2291 ft.Measured PB depth:2285 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL. SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 722 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2262 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 2262 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1807 ft.NN
VERMEJO COAL1807 ft.2130 ft.NN
TRINIDAD2130 ft.2291 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/30/2005                 Interval Top: 1886 ft.    Interval Bottom: 2096 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/29/2001
Treatment Summary:ACIDIZED W/1000 GALS 15% HCL ACID. FRAC'D W/142,730 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 34,800# 16/30 & 184,703# 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2005Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 96
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 240
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 4
CASING_PRESS 0
MCF_GAS 0
TUBING_PRESS 3
Perforation Data:
Interval Top:1886 ft.# Of Holes:32
Interval Bottom:2096 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/2/2006                 Interval Top: 801 ft.    Interval Bottom: 1253 ft.

 Completed Information for Formation RATON COAL
1st Production Date:10/1/2006Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/18/2006
Treatment Summary:ACIDIZED W/3000 GALS 15% HCL ACID. FRAC'D W/161,184 GALS 20# DELTA 140 W/SANDWEDGE CARRYING 18,400# 16/30 AND 261,612# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1341 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 0
BTU_GAS 1003
CALC_BBLS_H2O 24
CALC_BBLS_OIL 0
CALC_MCF_GAS 9
CASING_PRESS 4
GRAVITY_OIL 1
MCF_GAS 9
TUBING_PRESS 1
Perforation Data:
Interval Top:801 ft.# Of Holes:57
Interval Bottom:1253 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/2/2006

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/1/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24237
GOR
GOR DeterminationMCFE
Average BOE per Day11.450
Average MCFE per Day66.390

 Federal Financial Assurance  i 

 Tribal Well  i No