Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07346
Well Classification: CBM Status: PR - 10/1/2014
Well Name/No:HILL RANCH #01-05V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2014
FacilityID:260007LocationID:307988
County:LAS ANIMAS #071Location:SWNW 1 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7892 ft.
Planned Location:1497FNL  716 FWLLat/Long: 37.029375 / -104.845498Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029297 / -104.845404Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2014             Measured TD: 2365 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2014
Wellbore Permit
Permit #:20010862 Expiration Date:5/3/2002
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/16/2001
Spud Date:6/18/2001Spud Date Is:ACTUAL
Measured TD:2365 ft.Measured PB depth:2346 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL,SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 344 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 344 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2341 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 40 ft., Bottom: 2341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1935 ft.NN
VERMEJO COAL1935 ft.2206 ft.NN
TRINIDAD2206 ft.2365 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  TA - 5/1/2020                  Interval Top: 1877 ft.    Interval Bottom: 2170 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:Status Change
Formation Treatment
Treatment Date:12/6/2001
Treatment Summary:SLICK WATER COBRA FRAC PERFORATIONS: 2160'-2163'-2166'-70' (4 SPF, 28 HOLES) FRAC 1ST STAGE: 56 BBL ACID, 24,351 FRAC FLUID INC. PAD, 16,000# 20/40 BRADY SAND PERFORATIONS: 2076'-79', 2084'-86', 2088'-91', 2093'-96' (4 SPF, 44 HOLES) FRAC 2ND STAGE: 36 BBL ACID , 29,719 FRAC FLUID INC. PAD, 16,013# 20/40 BRADY SAND PERFORATIONS: 1937'-40', 1944'-47' (4 SPF, 24 HOLES) FRAC 3RD STAGE: 37 BBL ACCID, 24,133 FRAC FLUID INC. PAD, 16,000# 20/40 BRADY SAND PERFORATIONS: 1877'-87' ( 4 SPF, 40 HOLES) FRAC 4TH STAGE: 27 BBL ACID, 40,074 FRAC FLUID INC. PAD, 32,000# 20/40 BRADY SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 218
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 218
CALC_BBLS_OIL 0
CALC_MCF_GAS 3
CASING_PRESS 25
MCF_GAS 3
Perforation Data:
Interval Top:1877 ft.# Of Holes:136
Interval Bottom:2170 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  PR - 10/1/2014                 Interval Top: 570 ft.    Interval Bottom: 1400 ft.

 Completed Information for Formation RATON COAL
1st Production Date:9/27/2006Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/8/2006
Treatment Summary:ACIDIZED W/3000 GALS 15% HCL ACID. FRAC'D W/177,526 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,900# 16/30 AND 310,141# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1501 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 95
BBLS_OIL 0
BTU_GAS 1002
CALC_BBLS_H2O 95
CALC_BBLS_OIL 0
CALC_MCF_GAS 4
CASING_PRESS 5
GRAVITY_OIL 1
MCF_GAS 4
TUBING_PRESS 3
Perforation Data:
Interval Top:570 ft.# Of Holes:65
Interval Bottom:1400 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12021
GOR
GOR DeterminationMCFE
Average BOE per Day5.676
Average MCFE per Day32.930

 Federal Financial Assurance  i 

 Tribal Well  i No