|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2025 Measured TD: 2110 ft. Vertical TD: 2110 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | 20010816 | Expiration Date: | 4/29/2002 | | Proposed Depth/Form: | 2240 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/11/2001 | | Spud Date: | 10/22/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2110 ft. | Measured PB depth: | 2026 ft. | | True Vertical TD: | 2110 ft. | True Vertical PB depth: | 2026 ft. | | Log Types: | ARRAY INDUCTION, ENLD, CBL, AND MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 226 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2044 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 2034 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1418 ft. | N | N | | VERMEJO COAL | 1554 ft. | 1848 ft. | N | N | | TRINIDAD | 1854 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 910 ft. Interval Bottom: 1842 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/11/2001 | | Treatment Summary: | 12-04-01 PUMPED 1,925 GALS OF 7.5% HCL ACID, 138 BIO BALLS, 1,525,927 SCF N2 WITH 174,980 LBS OF 16/30 MESH SAND AT 16 BPM ( STAGE 1 THRU STAGE 5 ) THRU 132 HOLES 910' - 1,842'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1903 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2001 | Test Method: | PUMPING FLOW | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 79 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 79 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 910 ft. | # Of Holes: | 132 | | Interval Bottom: | 1842 ft. | Hole Size: | |
|
Sidetrack #01 Wellbore Classification: CBM Status: PR - 12/19/2001 Measured TD: 3581 ft. Vertical TD: 1812 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: CBM PR - 12/19/2001 | | Wellbore Permit | HORIZONTAL | | Permit #: | 20050683 | Expiration Date: | 3/30/2006 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 658 FWL 1929 FNL | | Bottom Hole Location: | Sec: Twp: | Footage: 2590 FWL 50 FNL | | Proposed Depth/Form: | 4470 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/18/2005 | | Spud Date: | 5/13/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 3581 ft. | Measured PB depth: | 2026 ft. | | True Vertical TD: | 1812 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 1803 FNL 850 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 634 FNL 1952 FWL | | Log Types: | MWD LOG | | Casing: | String Type: 1ST LINER, Hole Size: 4.75 in., Size: 3.5 in., Top: 1686 ft., Depth: 3435 ft., Weight: 9.3 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | VERMEJO COAL | 2017 ft. | 3581 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 6/20/2005 Interval Top: 1686 ft. Interval Bottom: 3435 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 12/19/2001 | Choke Size: | 0.141 in. | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/18/2005 | | Treatment Summary: | CIRCULATED AND CLEAN OUT WELL BORE. ACIDIZED PERFS FROM 910' - 1419' WITH 2000 GALS 15% HCL RAN PRODUCTION EQUIPMENT AND PUT WELL BACK ON PRODUCTION. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1920 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/20/2005 | Test Method: | PUMPING | | Hours Tested: | | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 447 | | CASING_PRESS | 27 | | MCF_GAS | 32 |
| | Perforation Data: | | Interval Top: | 1686 ft. | # Of Holes: | | | Interval Bottom: | 3435 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: CM - 12/19/2001 Interval Top: 910 ft. Interval Bottom: 1842 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 12/19/2001 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/18/2005 | | Treatment Summary: | 12/4/2001: PUMPED 1,925 GALS OF 7.5& HCL ACID; 138 BIO BALLS; 1,525,927 SCF N2 W/ 174,980# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 5) THRU 132 HOLES 910' - 1,842'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1903 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2001 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 79 | | CALC_BBLS_H2O | 79 | | CALC_MCF_GAS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 910 ft. | # Of Holes: | 132 | | Interval Bottom: | 1842 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 18 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.009 |
| Average MCFE per Day | 0.054 |
| Federal Financial Assurance | i | |
|
|