|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/1/2025 Measured TD: 1857 ft. Vertical TD: 1857 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 20010815 | Expiration Date: | 4/29/2002 | | Proposed Depth/Form: | 1980 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 9/26/2001 | | Spud Date: | 9/3/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 1857 ft. | Measured PB depth: | 1807 ft. | | True Vertical TD: | 1857 ft. | True Vertical PB depth: | 1807 ft. | | Log Types: | ARRAY INDUCTION, ENLD, CBL & MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 231 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 90, Top: 0 ft., Bottom: 231 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1813 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 1801 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1228 ft. | N | N | | VERMEJO COAL | 1317 ft. | 1564 ft. | N | N | | TRINIDAD | 1573 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 1407 ft. Interval Bottom: 1564 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 9/28/2001 | Choke Size: | 0.250 in. | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/26/2001 | | Treatment Summary: | 9/18/2001 PUMPED 500 GALS OF 7.5% HCL, 30 BALL SEALERS, 1,030,000 SCF N2 W/ 136,000# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 & STAGE 2) THRU 72 HOLES 1407' - 1564' . |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1629 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/28/2001 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 228 | | CALC_BBLS_H2O | 228 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 0 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 1407 ft. | # Of Holes: | 72 | | Interval Bottom: | 1564 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1179 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.559 |
| Average MCFE per Day | 3.248 |
| Federal Financial Assurance | i | |
|
|