Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07323
Well Classification: CBM Status: PR - 1/4/2002
Well Name/No:VPR C #72
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/4/2002
FacilityID:259943LocationID:307970
County:LAS ANIMAS #071Location:SWSE 22 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7648 ft.
Basin:RATON BASIN  
Planned Location:1281FSL  1434 FELLat/Long: 37.066434 / -104.762735Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.066420 / -104.762730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/4/2002             Measured TD: 2230 ft.    Vertical TD: 2230 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/4/2002
Wellbore Permit
Permit #:20010812 Expiration Date:4/29/2002
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/6/2001
Spud Date:10/21/2001Spud Date Is:ACTUAL
Measured TD:2230 ft.Measured PB depth:2154 ft.
True Vertical TD:2230 ft.True Vertical PB depth:2154 ft.
Log Types:ARRAY INDUCTION, ENLD,CBL AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 659 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 178, Top: 0 ft., Bottom: 659 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2185 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 0 ft., Bottom: 2185 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1615 ft.NN
VERMEJO COAL1683 ft.1965 ft.NN
TRINIDAD1970 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 1/4/2002                  Interval Top: 1011 ft.    Interval Bottom: 1958 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/11/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING CBM GAS WELL. PROUDCED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:12/6/2001
Treatment Summary:11/19/01 PUMPED 2,100 GALS OF 7.5% HCL ACID; 1,139,551 SCF N2 W/ 231,980 # OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 9) THRU 120 HOLES 1,011' - 1,958'.
Tubing Size:2.875 in.Tubing Setting Depth:2008 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2001Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
CALC_BBLS_H2O 57
CALC_MCF_GAS 12
CASING_PRESS 35
MCF_GAS 12
Perforation Data:
Interval Top:1011 ft.# Of Holes:120
Interval Bottom:1958 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)50362
GOR
GOR DeterminationMCFE
Average BOE per Day23.792
Average MCFE per Day137.994

 Federal Financial Assurance  i 

 Tribal Well  i No