Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07317
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #69
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:259898LocationID:307964
County:LAS ANIMAS #071Location:SENW 26 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7678 ft.
Basin:RATON BASIN  
Planned Location:1392FNL  1344 FWLLat/Long: 37.059085 / -104.753205Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.059080 / -104.753210Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2011
End Date: 2/23/2011
Reported: 9/14/2011
Prior to rule 205A.b.(2)(A)
Days to report: 203
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 2205 ft.    Vertical TD: 2205 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20010770 Expiration Date:4/24/2002
Proposed Depth/Form:2380 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/6/2001
Spud Date:10/7/2001Spud Date Is:ACTUAL
Measured TD:2205 ft.Measured PB depth:2155 ft.
True Vertical TD:2205 ft.True Vertical PB depth:2155 ft.
Log Types:ARRAY INDUCTION, ENLD, CBL & MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 226 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2158 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 2142 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1875 ft.NN
VERMEJO COAL1670 ft.1948 ft.NN
TRINIDAD1954 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 1002 ft.    Interval Bottom: 1944 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/15/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:11/6/2001
Treatment Summary:10/24/2001. PUMPED 1,450 GALS 30# LINEAR GEL ACID; 1,700 GALS OF 7.5% HCL ACID; 1,975,696 SCF N2 W/188,980# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 5) THRU 104 HOLES 1002' - 1944'.
Tubing Size:2.875 in.Tubing Setting Depth:1989 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/15/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 0
CASING_PRESS 0
MCF_GAS 0
Perforation Data:
Interval Top:1002 ft.# Of Holes:104
Interval Bottom:1944 ft.Hole Size:0.51 in.

Sidetrack #01             Wellbore Classification: CBM             Status: PR - 11/11/2004             Measured TD: 3393 ft.    Vertical TD: 1927 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: CBM        PR - 11/11/2004
Wellbore PermitHORIZONTAL
Permit #:20042005 Expiration Date:9/2/2005
Proposed Top PZ Location:Sec:26 Twp: 34S 66W Footage: 1392 FNL  1344 FWL
Bottom Hole Location:Sec:26 Twp: 34S 66W Footage: 10 FNL  2630 FWL
Proposed Depth/Form:3763 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/10/2004
Spud Date:10/27/2004Spud Date Is:ACTUAL
Measured TD:3393 ft.Measured PB depth:3393 ft.
True Vertical TD:1927 ft.True Vertical PB depth:1927 ft.
Top PZ Location:Sec:26 Twp: 34S 66WFootage: 1338 FNL  1435 FWL
Bottom Hole Location:Sec:26 Twp: 34S 66WFootage: 1338 FNL  1435 FWL
Log Types:MWD LOG
Casing:String Type: 1ST LINER, Hole Size: 4.75 in., Size: 3.5 in., Top: 1806 ft., Depth: 3347 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 0, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1980 ft.3393 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  CM - 11/11/2004                Interval Top: 1905 ft.    Interval Bottom: 3347 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/11/2004Choke Size:0.141 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMP CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:11/10/2004
Treatment Summary:PERFS 1002'-1110' ACIDIZED WITH 500 GAL.OF 15% HCL
Tubing Size:2.875 in.Tubing Setting Depth:2037 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/11/2004Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 142
CASING_PRESS 44
MCF_GAS 6
Perforation Data:
Interval Top:1905 ft.# Of Holes:
Interval Bottom:3347 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20462
GOR
GOR DeterminationMCFE
Average BOE per Day9.664
Average MCFE per Day56.068

 Federal Financial Assurance  i 

 Tribal Well  i No