Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07314
Well Classification: CBM Status: PR - 2/1/2026
Well Name/No:VPR C #68
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2026
FacilityID:259895LocationID:307961
County:LAS ANIMAS #071Location:NWNE 27 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7742 ft.
Basin:RATON BASIN  
Planned Location:1242FNL  1665 FELLat/Long: 37.059495 / -104.763525Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.059490 / -104.763520Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2026             Measured TD: 2290 ft.    Vertical TD: 2290 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2026
Wellbore Permit
Permit #:20010767 Expiration Date:4/24/2002
Proposed Depth/Form:2470 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/8/2001
Spud Date:10/19/2001Spud Date Is:ACTUAL
Measured TD:2290 ft.Measured PB depth:2214 ft.
True Vertical TD:2290 ft.True Vertical PB depth:2214 ft.
Log Types:ARRAY INDUCTION,ENLD,CBL AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2237 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 294, Top: 102 ft., Bottom: 2290 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1634 ft.NN
VERMEJO COAL1789 ft.2053 ft.NN
TRINIDAD2062 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/1/2026                  Interval Top: 1051 ft.    Interval Bottom: 2053 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/11/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING CBM GAS WELL. PRODUED WATER INJECTED IN WDW.
Open Hole Completion:
Formation Treatment
Treatment Date:12/8/2001
Treatment Summary:11/28/01 PUMPED 850 GALS OF 7.5% HCL ACID, 1,344,269 SCF N2 WITH 279,260 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 9) THRU 160" HOLES 1051' - 2053'.
Tubing Size:2.875 in.Tubing Setting Depth:2107 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/11/2001Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 10
CASING_PRESS 28
MCF_GAS 10
Perforation Data:
Interval Top:1051 ft.# Of Holes:160
Interval Bottom:2053 ft.Hole Size:0.51 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)808
GOR
GOR DeterminationMCFE
Average BOE per Day0.383
Average MCFE per Day2.208

 Federal Financial Assurance  i 

 Tribal Well  i No