Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07308
Well Classification: CBM Status: PR - 12/4/2001
Well Name/No:VPR C #59
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/4/2001
FacilityID:259839LocationID:307955
County:LAS ANIMAS #071Location:NWNW 34 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7823 ft.
Planned Location:1245FNL  1067 FWLLat/Long: 37.044975 / -104.772246Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.044970 / -104.772240Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/4/2001             Measured TD: 2365 ft.    Vertical TD: 2365 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/4/2001
Wellbore Permit
Permit #:20010720 Expiration Date:4/18/2002
Proposed Depth/Form:2480 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/27/2001
Spud Date:9/24/2001Spud Date Is:ACTUAL
Measured TD:2365 ft.Measured PB depth:2312 ft.
True Vertical TD:2365 ft.True Vertical PB depth:2312 ft.
Log Types:ARRAY INDUCTION, ENLD, & CBL.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 573 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 154, Top: 0 ft., Bottom: 573 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2318 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 354, Top: 1120 ft., Bottom: 2340 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 50 ft., Bottom: 844 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1761 ft.NN
VERMEJO COAL1874 ft.2125 ft.NN
TRINIDAD2134 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 12/4/2001                 Interval Top: 1251 ft.    Interval Bottom: 2121 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/4/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:11/27/2001
Treatment Summary:11/14/2001. PUMPED 1,550 GALS OF 7.5% HCL; 1,101,929 SCF N2 W/ 181,000# 0F 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE9) THRU 132 HOLES 1,251' - 2121'.
Tubing Size:2.875 in.Tubing Setting Depth:2134 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/4/2001Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 79
CALC_BBLS_H2O 79
CALC_MCF_GAS 0
CASING_PRESS 0
MCF_GAS 0
Perforation Data:
Interval Top:1251 ft.# Of Holes:132
Interval Bottom:2121 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10897
GOR
GOR DeterminationMCFE
Average BOE per Day5.149
Average MCFE per Day29.846

 Federal Financial Assurance  i 

 Tribal Well  i No