Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07298
Well Classification: CBM Status: PR - 2/7/2010
Well Name/No:HILL RANCH #10-14V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2010
FacilityID:259818LocationID:307949
County:LAS ANIMAS #071Location:SESW 10 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8181 ft.
Basin:RATON BASIN  
Planned Location:669FSL  1778 FWLLat/Long: 37.006335 / -104.877978Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.006340 / -104.877990Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2010             Measured TD: 2456 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2010
Wellbore Permit
Permit #:20010696 Expiration Date:4/15/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/9/2001
Spud Date:6/6/2001Spud Date Is:ACTUAL
Measured TD:2456 ft.Measured PB depth:2453 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 210 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 210 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2553 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 30 ft., Bottom: 2553 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2170 ft.NN
VERMEJO COAL2170 ft.2443 ft.NN
TRINIDAD2443 ft.2605 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/7/2010                  Interval Top: 2179 ft.    Interval Bottom: 2426 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/3/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2010
Treatment Summary:ACIDIZED WITH 1500 GALS 15% HCI ACID. REFRACD WITH 61340 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 8500# 16/30 BRADY SD AND 166100# 12/20 BRADY SD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 86
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 86
CALC_MCF_GAS 128
CASING_PRESS 25
MCF_GAS 128
Perforation Data:
Interval Top:2179 ft.# Of Holes:84
Interval Bottom:2426 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/7/2010                  Interval Top: 578 ft.    Interval Bottom: 2426 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/5/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2489 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/7/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 66
BTU_GAS 1002
CALC_BBLS_H2O 66
CALC_MCF_GAS 29
CASING_PRESS 5
MCF_GAS 29
TUBING_PRESS 3
Perforation Data:
Interval Top:578 ft.# Of Holes:130
Interval Bottom:2426 ft.Hole Size:0.45 in.

Formation RTONS                   Formation Classification:  GW                   Status:  CM - 2/7/2010                  Interval Top: 578 ft.    Interval Bottom: 1510 ft.

 Completed Information for Formation RATON SAND
1st Production Date:2/5/2010Choke Size: 
Formation Name:RATON SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2010
Treatment Summary:ACIDIZED WITH 2300 GALS 15% HCI ACID. FRACD WITH 109162 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 15000# 16/30 BRADY SD AND 211493# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTONS.
Perforation Data:
Interval Top:578 ft.# Of Holes:46
Interval Bottom:1510 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)21456
GOR
GOR DeterminationMCFE
Average BOE per Day10.139
Average MCFE per Day58.809

 Federal Financial Assurance  i 

 Tribal Well  i No