Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07297
Well Classification: CBM Status: PR - 3/7/2010
Well Name/No:HILL RANCH #16-04V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/7/2010
FacilityID:259817LocationID:307948
County:LAS ANIMAS #071Location:NWNW 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8201 ft.
Basin:RATON BASIN  
Planned Location:942FNL  1222 FWLLat/Long: 37.001935 / -104.897959Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.001910 / -104.897960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/7/2010             Measured TD: 2545 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/7/2010
Wellbore Permit
Permit #:20010695 Expiration Date:4/15/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/28/2001
Spud Date:5/31/2002Spud Date Is:ACTUAL
Measured TD:2545 ft.Measured PB depth:2528 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 212 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2522 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 0 ft., Bottom: 2522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2142 ft.NN
VERMEJO COAL2142 ft.2422 ft.NN
TRINIDAD2422 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/7/2010                  Interval Top: 2149 ft.    Interval Bottom: 2399 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/4/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2010
Treatment Summary:NEW PERFS ADDED FROM 2149' - 2150' (3 HOLES). ACIDIZED W/ 1,000 GALS 15% HCI ACID. REFRAC'D W/ 78,766 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 7500# 16/30 BRADY SND & 141,180# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 224
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 224
CALC_MCF_GAS 12
CASING_PRESS 25
MCF_GAS 12
Perforation Data:
Interval Top:2149 ft.# Of Holes:59
Interval Bottom:2399 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/7/2010                  Interval Top: 529 ft.    Interval Bottom: 2399 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/4/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2458 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 125
BTU_GAS 1021
CALC_BBLS_H2O 125
CALC_BBLS_OIL 0
CALC_MCF_GAS 137
CASING_PRESS 4
MCF_GAS 137
TUBING_PRESS 2
Perforation Data:
Interval Top:529 ft.# Of Holes:104
Interval Bottom:2399 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/7/2010                  Interval Top: 529 ft.    Interval Bottom: 1483 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/4/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2010
Treatment Summary:ACIDIZED W/ 2,000 GALS 15% HCI ACID. FRAC'D W/ 95,626 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 17,445# 16/30 BRADY SND & 147,551# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:529 ft.# Of Holes:45
Interval Bottom:1483 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18999
GOR
GOR DeterminationMCFE
Average BOE per Day8.974
Average MCFE per Day52.044

 Federal Financial Assurance  i 

 Tribal Well  i No