Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07295
Well Classification: CBM Status: PR - 11/23/2009
Well Name/No:HILL RANCH #16-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/23/2009
FacilityID:259815LocationID:307947
County:LAS ANIMAS #071Location:SWNE 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8226 ft.
Basin:RATON BASIN  
Planned Location:1527FNL  1609 FELLat/Long: 37.000325 / -104.889579Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.000290 / -104.889580Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/23/2009             Measured TD: 2645 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/23/2009
Wellbore Permit
Permit #:20010693 Expiration Date:4/15/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/29/2001
Spud Date:6/2/2001Spud Date Is:ACTUAL
Measured TD:2645 ft.Measured PB depth:2577 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL. SIL. CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 215 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2532 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 2532 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2190 ft.NN
VERMEJO COAL2190 ft.2478 ft.NN
TRINIDAD2478 ft.2635 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 11/23/2009                Interval Top: 2198 ft.    Interval Bottom: 2438 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/3/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2001
Treatment Summary:ACIDIZED W/1,500 GALS 15% HCI ACID. REFRAC'D W/87,334 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 9,904# 16/30 BRADY SD & 149,266# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 141
CASING_PRESS 25
MCF_GAS 141
Perforation Data:
Interval Top:2198 ft.# Of Holes:
Interval Bottom:2438 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/23/2009                Interval Top: 489 ft.    Interval Bottom: 2438 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:11/19/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/29/2001
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:2466 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/23/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 0
BTU_GAS 1007
CALC_BBLS_H2O 61
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 49
CASING_PRESS 3
MCF_GAS 49
TUBING_PRESS 2
Perforation Data:
Interval Top:489 ft.# Of Holes:
Interval Bottom:2438 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 11/23/2009                Interval Top: 489 ft.    Interval Bottom: 1531 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/19/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/11/2009
Treatment Summary:ACIDIZED W/ 3,400 GALS 15% HCI. FRAC'D W/139,296 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 11,600# 16/30 BRADY SD & 228,245# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:489 ft.# Of Holes:80
Interval Bottom:1531 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20367
GOR
GOR DeterminationMCFE
Average BOE per Day9.622
Average MCFE per Day55.800

 Federal Financial Assurance  i 

 Tribal Well  i No