|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/29/2001 Measured TD: 2445 ft. Vertical TD: 2445 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/29/2001 | Wellbore Permit | | Permit #: | 010674 | Expiration Date: | 4/12/2002 | Proposed Depth/Form: | 2626 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/8/2001 | Spud Date: | 9/1/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2445 ft. | Measured PB depth: | 2422 ft. | True Vertical TD: | 2445 ft. | True Vertical PB depth: | 2422 ft. | Log Types: | ARRAY INDUCTION, COMPENSATED LITHO DENSITY, CEMENT BOND LOG(S) AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 237 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 0 ft., Bottom: 237 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2426 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 854 ft., Bottom: 2445 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 90, Top: 54 ft., Bottom: 854 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 200 ft. | 1893 ft. | N | N | VERMEJO COAL | 2000 ft. | 2225 ft. | N | N | TRINIDAD | 2235 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 5/14/2002 Interval Top: 911 ft. Interval Bottom: 2189 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/8/2001 | Treatment Summary: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2257 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/11/2001 | Test Method: | PUMP | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 171 | BBLS_OIL | 0 | CALC_BBLS_H2O | 171 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 0 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 911 ft. | # Of Holes: | 228 | Interval Bottom: | 2189 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 78637 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 37.151 |
Average MCFE per Day | 215.477 |
Federal Financial Assurance | i | |
|
|