Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07278
Well Classification: CBM Status: PR - 10/1/2024
Well Name/No:VPR C #87
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:259793LocationID:307939
County:LAS ANIMAS #071Location:NESE 32 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7692 ft.
Planned Location:1885FSL  317 FELLat/Long: 37.039075 / -104.795086Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.039060 / -104.795080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2024             Measured TD: 2260 ft.    Vertical TD: 2260 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2024
Wellbore Permit
Permit #:20010673 Expiration Date:4/12/2002
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/3/2001
Spud Date:9/17/2001Spud Date Is:ACTUAL
Measured TD:2260 ft.Measured PB depth:2215 ft.
True Vertical TD:2260 ft.True Vertical PB depth:2215 ft.
Log Types:ARRAY INDUCTION,ENLD, AND CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 438 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 438 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2215 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 323, Top: 175 ft., Bottom: 2206 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 175 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON COAL150 ft.1763 ft.NN
VERMEJO COAL1756 ft.2022 ft.NN
TRINIDAD2036 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/5/2003                  Interval Top: 2015 ft.    Interval Bottom: 2022 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/7/2001Choke Size:0.250 in.
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:12/3/2001
Treatment Summary:11/19/01 PUMPED 25 GAL FRESH WATER,400 GAL 7.5% HCL ACID W/ADDITIVES AT 3 BPM, 100 GAL OF 7.5% HCL ACID, THEN 2010 GAL FRESH WATER. START 4,000 GALS FRESH WATER W/2 MIC IRIDIUM ZW RADIOACTIVE TRACER AT 16 BPM.
Tubing Size:2.875 in.Tubing Setting Depth:2067 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/7/2001Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
CALC_BBLS_H2O 57
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:2015 ft.# Of Holes:42
Interval Bottom:2022 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2024                 Interval Top: 827 ft.    Interval Bottom: 2004 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/7/2001Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/2/2003
Treatment Summary:PUMPED FRACTURE TREATMENT WITH 73,610 LBS OF 20/40 OTTAWA/TLC SAND AT 10.5 BPM, ATP 2,431 PSI, FINAL ISIP 962 PSI (STAGE 1: 2002'-2004', STAGE 2: 1874'-1876', STAGE 3: 1559'-1561', 1594'-1596', STAGE 4: 827'-829', 832'-834') 06-05-03 RUN PRODUCTION EQUIPMENT AND PUT BACK ON PRODUCTION
Formation Treatment
Treatment Date:12/3/2001
Treatment Summary:PUMPED 25 GALS OF FRESH WATER, 400 GALS OF 7.5% HCL ACID WITH ADDITIVES AT 3 BPM, 100 GALS OF 7.5% HCL ACID, THEN 2,010 GALS OF FRESH WATER. START 4,000 GALS FRESH WATER W/ 2 MIC IRIDIUM ZW RADIOACTIVE TRACER AT 16 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:827 ft.# Of Holes:30
Interval Bottom:2004 ft.Hole Size:0.51 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)15
GOR
GOR DeterminationMCFE
Average BOE per Day0.005
Average MCFE per Day0.041

 Federal Financial Assurance  i 

 Tribal Well  i No