|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/10/2001 Measured TD: 2380 ft. Vertical TD: 2380 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/10/2001 | Wellbore Permit | | Permit #: | 20010672 | Expiration Date: | 4/12/2002 | Proposed Depth/Form: | 2450 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/9/2001 | Spud Date: | 9/11/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2380 ft. | Measured PB depth: | 2286 ft. | True Vertical TD: | 2380 ft. | True Vertical PB depth: | 2286 ft. | Log Types: | ARRAY INDUCTION,ENLD, & CEMENT BOND LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 533 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 145, Top: 0 ft., Bottom: 633 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2159 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 340, Top: 914 ft., Bottom: 2284 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 676 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 58, Top: 42 ft., Bottom: 676 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 150 ft. | 1716 ft. | N | N | VERMEJO COAL | 1847 ft. | 2123 ft. | N | N | TRINIDAD | 2125 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 10/10/2001 Interval Top: 1124 ft. Interval Bottom: 2115 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 10/10/2001 | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/9/2001 | Treatment Summary: | 9/22/01. PUMPED 1,800 GALS OF 7.5% HCL ACID, 120 BIOBALL SEALERS, 930,000 SCF N2 W/144,000# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 4) THRU 132 HOLES 1124' - 2115'. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2178 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/10/2001 | Test Method: | PUMP | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 85 | CALC_BBLS_H2O | 85 | CALC_MCF_GAS | 0 | CASING_PRESS | 0 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 1124 ft. | # Of Holes: | 132 | Interval Bottom: | 2115 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 28860 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 13.637 |
Average MCFE per Day | 79.074 |
Federal Financial Assurance | i | |
|
|