Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07277
Well Classification: CBM Status: PR - 10/10/2001
Well Name/No:VPR C #86
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/10/2001
FacilityID:259792LocationID:307938
County:LAS ANIMAS #071Location:SESE 33 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7788 ft.
Basin:RATON BASIN  
Planned Location:1310FSL  1214 FELLat/Long: 37.037505 / -104.780066Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.037490 / -104.780060Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/10/2001             Measured TD: 2380 ft.    Vertical TD: 2380 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/10/2001
Wellbore Permit
Permit #:20010672 Expiration Date:4/12/2002
Proposed Depth/Form:2450 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/9/2001
Spud Date:9/11/2001Spud Date Is:ACTUAL
Measured TD:2380 ft.Measured PB depth:2286 ft.
True Vertical TD:2380 ft.True Vertical PB depth:2286 ft.
Log Types:ARRAY INDUCTION,ENLD, & CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 533 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 633 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2159 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 914 ft., Bottom: 2284 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 676 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 58, Top: 42 ft., Bottom: 676 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL150 ft.1716 ft.NN
VERMEJO COAL1847 ft.2123 ft.NN
TRINIDAD2125 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/10/2001                Interval Top: 1124 ft.    Interval Bottom: 2115 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/10/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:10/9/2001
Treatment Summary:9/22/01. PUMPED 1,800 GALS OF 7.5% HCL ACID, 120 BIOBALL SEALERS, 930,000 SCF N2 W/144,000# OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 4) THRU 132 HOLES 1124' - 2115'.
Tubing Size:2.875 in.Tubing Setting Depth:2178 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
CALC_BBLS_H2O 85
CALC_MCF_GAS 0
CASING_PRESS 0
MCF_GAS 0
Perforation Data:
Interval Top:1124 ft.# Of Holes:132
Interval Bottom:2115 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27979
GOR
GOR DeterminationMCFE
Average BOE per Day13.220
Average MCFE per Day76.674

 Federal Financial Assurance  i 

 Tribal Well  i No