Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07231
Well Classification: CBM Status: PR - 5/5/2007
Well Name/No:HILL RANCH #31-02 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/5/2007
FacilityID:259273LocationID:307902
County:LAS ANIMAS #071Location:NWNE 31 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8221 ft.
Basin:RATON BASIN  
Planned Location:1305FNL  1589 FELLat/Long: 37.044454 / -104.925710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.044450 / -104.925670Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/5/2007             Measured TD: 2545 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/5/2007
Wellbore Permit
Permit #:010266 Expiration Date:2/11/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/5/2001
Spud Date:4/23/2001Spud Date Is:ACTUAL
Measured TD:2545 ft.Measured PB depth:2514 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 211 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2511 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: , Bottom: 2505 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2121 ft.NN
VERMEJO COAL2121 ft.2431 ft.NN
TRINIDAD2431 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/9/2001                 Interval Top: 2210 ft.    Interval Bottom: 2559 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/9/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/2001
Treatment Summary:ACIDIZED W/100 GALS 7.5% HCI ACID. FRAC'D W/26,855 GALS FLUID (INC PAD), 99,320# 16/30 BRADY SAND & 634,129 SCF N2.
Tubing Size:2.875 in.Tubing Setting Depth:2480 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2001Test Method:ORIFICE MTR
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 230
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 230
CALC_BBLS_OIL 0
CALC_MCF_GAS 9
CASING_PRESS 25
MCF_GAS 9
Perforation Data:
Interval Top:2210 ft.# Of Holes:128
Interval Bottom:2559 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/8/2007                  Interval Top: 557 ft.    Interval Bottom: 1448 ft.

 Completed Information for Formation RATON COAL
1st Production Date:5/5/2007Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2007
Treatment Summary:ACIDIZED W/3000 GALS 15% HCI ACID. FRAC'D W/198,154 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 18,000# 16/30 & 435,951 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1540 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/8/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 100
CALC_BBLS_OIL 0
CALC_MCF_GAS 21
CASING_PRESS 3
MCF_GAS 21
TUBING_PRESS 7
Perforation Data:
Interval Top:557 ft.# Of Holes:83
Interval Bottom:1448 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/5/2007

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:5/5/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13647
GOR
GOR DeterminationMCFE
Average BOE per Day6.445
Average MCFE per Day37.380

 Federal Financial Assurance  i 

 Tribal Well  i No