|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/20/2001 Measured TD: 2540 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/20/2001 | | Wellbore Permit | | | Permit #: | 20010265 | Expiration Date: | 2/11/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/20/2001 | | Spud Date: | 3/3/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2540 ft. | Measured PB depth: | 2366 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, GAMMA NEUTRON, CBL (2) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 423 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 423 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2506 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 573 ft., Bottom: 2462 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 20 ft., Bottom: 442 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2130 ft. | N | N | | VERMEJO COAL | 2130 ft. | 2430 ft. | N | N | | TRINIDAD | 2430 ft. | 2540 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 5/20/2001 Interval Top: 2164 ft. Interval Bottom: 2408 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 5/20/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMPING ( 30NO095 - PC ) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/20/2001 | | Treatment Summary: | COBRA FRAC W/ DELTA FOAM & SANDWEDGE PERFORATIONS: 2404'-08, 2394'-97' (4 SPF) FRAC 1ST STAGE W/ 7,622 GAL. FLUID (INC.PAD), 22,500# 16/30 BRADY, 194,000 SCF N2. PERFORATIONS: 2364'-68' (4 SPF) FRAC 2ND STAGE W/ 10,370 GAL. FLUID (INC. PAD), 33,200# 16/30 BRADY, 256,700 SCF N2. PERFORATIONS: 2322'-27' (4 SPF) FRAC 3RD STAGE W/ 5371 GAL FLUID (INC PAD) 16,800# 16/30 BRADY 135,067 SCF N2 PERFORATIONS: 2225'-31' (4 SPF) FRAC 4TH STAGE W/ 13,185 GAL. FLUID (INC. PAD), 41,800# 16/30 BRADY, 282,560 SCF N2. PERFORATIONS: 2164'-67' (4 SPF) FRAC 5TH STAGE W/ 4,936 GAL. FLUID (INC. PAD), 15,000# 16/30 BRADY, 107,891 SCF N2. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2412 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2001 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 272 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 272 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 25 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 2164 ft. | # Of Holes: | 100 | | Interval Bottom: | 2408 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 2856 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.351 |
| Average MCFE per Day | 7.824 |
| Federal Financial Assurance | i | |
|
|