|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/18/2001 Measured TD: 2250 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/18/2001 | | Wellbore Permit | | | Permit #: | 20020504 | Expiration Date: | 3/11/2003 | | Proposed Depth/Form: | 2500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/16/2002 | | Spud Date: | 3/14/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2250 ft. | Measured PB depth: | 2213 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL,SIL,CBL(2) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 406 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 406 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2228 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 195, Top: 2060 ft., Bottom: 2228 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 2060 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2250 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 10/18/2001 Interval Top: 1204 ft. Interval Bottom: 2142 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 10/18/2001 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | PUMPING (30NO025-PC) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/16/2002 | | Treatment Summary: | SEE SCANNED DOC 01098112 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2165 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/18/2001 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 222 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 222 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 25 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 1204 ft. | # Of Holes: | 380 | | Interval Bottom: | 2142 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 14892 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.035 |
| Average MCFE per Day | 40.799 |
| Federal Financial Assurance | i | |
|
|