Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07223
Well Classification: CBM Status: PR - 9/4/2005
Well Name/No:HILL RANCH #02-05 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/4/2005
FacilityID:259265LocationID:307900
County:LAS ANIMAS #071Location:SWNW 2 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8007 ft.
Basin:RATON BASIN  
Planned Location:1422FNL  378 FWLLat/Long: 37.029575 / -104.864718Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029570 / -104.864730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/4/2005             Measured TD: 2540 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/4/2005
Wellbore Permit
Permit #:20010258 Expiration Date:2/11/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/23/2001
Spud Date:3/2/2001Spud Date Is:ACTUAL
Measured TD:2540 ft.Measured PB depth:2418 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION, DENSITY, NEUTRON & CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 215 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2428 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 1970 ft., Bottom: 2428 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 250 ft., Bottom: 1970 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2030 ft.NN
VERMEJO COAL2030 ft.2354 ft.NN
TRINIDAD2354 ft.2540 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/4/2005                  Interval Top: 2046 ft.    Interval Bottom: 2299 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:5/23/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING (30NO95)
Open Hole Completion:
Formation Treatment
Treatment Date:5/23/2001
Treatment Summary:1ST STAGE: 2288'-90', 2293'-99' (4 SPF) FRAC W/ 920 GAL. 20# DELTA FRAC 140 (INC. PAD), 0# 16/30, 40,000 SCF N2. (COMMUNICATED) 2ND STAGE: 2247'-50' (4 SPF) FRAC W/ 15,163 GAL. 20# DELTA FRAC 140 (INC. PAD), 352,480 SCF N2, 50,200# 16/30. 3RD STAGE: 2217'-20' (4 SPF) FRAC W/ 5,353 GAL. 20# DELTA FRAC 140 (INC. PAD), 121,124 SCF N2, 16,900# 16/30. 4TH STAGE: 2107'-10', 2115'-17' (4 SPF) FRAC W/ 5,505 GAL. 20# DELTA FRAC 140 (INC. PAD), 130,433 SCF N2, 16,900# 16/30. 5TH : 2046'-50', 2058'-61' (4 SPF) FRAC W/ 5,773 GAL. 20# DELTA FRAC 140 (INC. PAD) , 137,447 SCF N2, 17,100# 16/30
Tubing Size:2.875 in.Tubing Setting Depth:2314 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/23/2001Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 136
BBLS_OIL 0
BTU_GAS 993
CALC_BBLS_H2O 136
CALC_BBLS_OIL 0
CALC_MCF_GAS 75
CASING_PRESS 25
MCF_GAS 75
Perforation Data:
Interval Top:2046 ft.# Of Holes:104
Interval Bottom:2299 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/4/2005                  Interval Top: 730 ft.    Interval Bottom: 2299 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/4/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Tubing Size:2.875 in.Tubing Setting Depth:2349 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 53
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 53
CALC_BBLS_OIL 0
CALC_MCF_GAS 27
CASING_PRESS 25
MCF_GAS 27
TUBING_PRESS 9
Perforation Data:
Interval Top:730 ft.# Of Holes:
Interval Bottom:2299 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/4/2005                  Interval Top: 730 ft.    Interval Bottom: 2010 ft.

 Completed Information for Formation RATON COAL
1st Production Date:5/25/2005Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:5/23/2001
Treatment Summary:W. W/1500 GALS 15% HCI ACID. FRAC'D W/159,167 GAL 20# DELTA 140 W/SANDWEDGE NT CARRYING 31,400# 16/30 & 302,500/3 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2018 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/25/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 200
BBLS_OIL 0
CALC_BBLS_H2O 200
CALC_BBLS_OIL 0
CALC_MCF_GAS 20
CASING_PRESS 15
MCF_GAS 20
Perforation Data:
Interval Top:730 ft.# Of Holes:59
Interval Bottom:2010 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12538
GOR
GOR DeterminationMCFE
Average BOE per Day5.926
Average MCFE per Day34.349

 Federal Financial Assurance  i 

 Tribal Well  i No