Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07219
Well Classification: CBM Status: PR - 2/23/2010
Well Name/No:HILL RANCH #35-12 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/23/2010
FacilityID:259259LocationID:307899
County:LAS ANIMAS #071Location:NWSW 35 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8031 ft.
Planned Location:1608FSL  613 FWLLat/Long: 37.037895 / -104.863918Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.037840 / -104.863850Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/23/2010             Measured TD: 2540 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/23/2010
Wellbore Permit
Permit #:010254 Expiration Date:2/8/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/10/2001
Spud Date:2/28/2001Spud Date Is:ACTUAL
Measured TD:2540 ft.Measured PB depth:2501 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION, DENSITY, NEUTRON & CEMENT BOND
Log Types:Induction, Density, Neutron & Cement Bond
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 213 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2509 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 2509 ft., Determination Method:
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 13 ft., Sacks: 10, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2050 ft.
VERMEJO COAL2050 ft.2380 ft.
TRINIDAD2380 ft.2540 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/23/2010                 Interval Top: 2052 ft.    Interval Bottom: 2333 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/16/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2010
Treatment Summary:ACIDIZED W/2000 GALS 15% HCL ACID. REFRAC'D W/84,578 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 7626# 16/30 BRADY SD & 171,824# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 31
BBLS_OIL 0
BTU_GAS 933
CALC_BBLS_H2O 31
CALC_BBLS_OIL 0
CALC_MCF_GAS 79
CASING_PRESS 25
MCF_GAS 79
Perforation Data:
Interval Top:2052 ft.# Of Holes:184
Interval Bottom:2333 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/23/2010                 Interval Top: 468 ft.    Interval Bottom: 2333 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/21/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2010
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2395 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/23/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 93
CALC_BBLS_OIL 0
CALC_GOR 1
CALC_MCF_GAS 146
CASING_PRESS 8
MCF_GAS 146
TUBING_PRESS 2
Perforation Data:
Interval Top:468 ft.# Of Holes:286
Interval Bottom:2333 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/23/2010                 Interval Top: 468 ft.    Interval Bottom: 1596 ft.

 Completed Information for Formation RATON COAL
1st Production Date:2/21/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2010
Treatment Summary:ACIDIZED W/5100 GALS 15% HCL ACID. FRAC'D W/286,569 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 32,093# 16/30 BRADY SD & 592,060# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:468 ft.# Of Holes:102
Interval Bottom:1596 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17595
GOR
GOR DeterminationMCFE
Average BOE per Day8.305
Average MCFE per Day48.197

 Federal Financial Assurance  i 

 Tribal Well  i No