|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/27/2005 Measured TD: 2265 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/27/2005 | | Wellbore Permit | | | Permit #: | 20010237 | Expiration Date: | 2/6/2002 | | Proposed Depth/Form: | 2000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/16/2002 | | Spud Date: | 1/23/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2265 ft. | Measured PB depth: | 2268 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 364 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 364 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2243 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 2243 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2248 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 5/27/2005 Interval Top: 804 ft. Interval Bottom: 1502 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 2/16/2002 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/27/2005 | | Treatment Summary: | ACIDIZED W/ 2500 GALS 15% HCI ACID, FRAC'D W/ 246,865 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 94,300# 16/30 & 343,800# 12/20 BRADY SAND | | Formation Treatment | | Treatment Date: | 2/16/2002 | | Treatment Summary: | PERFORATIONS: 2062'-65', 2072'-84', 2091'-95', 2115'-58', 2160'-76' (4 SPF. HOLES) DELTA FRAC FRAC 1ST STAGE: 85,195 GAL. FRAC FLUID, 2,000 SKS 16/30 BRADY, 200 GAL ACID |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1616 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/27/2005 | Test Method: | | | Hours Tested: | 8 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 62 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 186 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 150 | | MCF_GAS | 0 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 804 ft. | # Of Holes: | 114 | | Interval Bottom: | 1502 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 42326 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 20.002 |
| Average MCFE per Day | 116.023 |
| Federal Financial Assurance | i | |
|
|