|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/6/2020 Measured TD: 2425 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/6/2020 | | Wellbore Permit | | | Permit #: | 010235 | Expiration Date: | 2/6/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/24/2001 | | Spud Date: | 5/6/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2425 ft. | Measured PB depth: | 2419 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL ( 2 ) | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 211 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2352 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 439, Top: 0 ft., Bottom: 2352 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1743 ft. | N | N | | VERMEJO COAL | 1743 ft. | 2288 ft. | N | N | | TRINIDAD | 2288 ft. | 2368 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/29/2020 Interval Top: 1916 ft. Interval Bottom: 2226 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/24/2001 | | Treatment Summary: | PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1ST STAGE: UNABLE TO PUMP 1/4# SAND. SCREEN OUT 20# LINEAR GEL FRAC PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1-A STAGE: PUMPED 50 GAL 7.5% HCL, PAD 110 BBL, SLF N/A, FLUSH 20 BBL. PERFORATIONS; 2138'- |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 124 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 124 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1 | | CASING_PRESS | 25 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 1916 ft. | # Of Holes: | 152 | | Interval Bottom: | 2226 ft. | Hole Size: | 4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 5/6/2020 Interval Top: 372 ft. Interval Bottom: 2226 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 9/30/2018 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | Perforation Data: | | Interval Top: | 372 ft. | # Of Holes: | 299 | | Interval Bottom: | 2226 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 10/3/2018 Interval Top: 372 ft. Interval Bottom: 1377 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/4/2018 | Treatment End Date: | 9/28/2018 | | Treatment Summary: | Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1375' - 77', 1370' - 72', 1173' - 75', 1168' - 70', 1152' - 55' and 1115' - 18', Stage 2 - 1070' - 72', 1048' - 50', 1010' - 12', 983' - 85' and 919' - 21', Stage 3 - 889' - 90', 884' - 87', 880' - 82', 840' - 42' and 798' - 801', Stage 4 - 540' - 42', 516' - 18', 492' - 94', 469' - 72', 449' - 50' and 372' - 76' (49' net or 147 holes). A total of 156,622 gallons of produced water with 99,330 gallons of x-link and 105,849 lbs of 16/30 sand were pumped. All four stages were pumped according to design.
The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well. | | Total fluid used in treatment (bbls): | 6094 | Max pressure during treatment (psi): | 3084 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.49 | | Recycled water used in treatment (bbls): | 6094 | Total flowback volume recovered (bbls): | 3689 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 105849 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/2018 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BTU_GAS | 994 | | CALC_BBLS_H2O | 10 | | CALC_MCF_GAS | 9 | | MCF_GAS | 9 |
| | Perforation Data: | | Interval Top: | 372 ft. | # Of Holes: | 147 | | Interval Bottom: | 1377 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 23077 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 10.899 |
| Average MCFE per Day | 63.225 |
| Federal Financial Assurance | i | |
|
|