Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07213
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #22-01 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:259240LocationID:307897
County:LAS ANIMAS #071Location:NENE 22 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7903 ft.
Basin:RATON BASIN  
Planned Location:713FNL  1066 FELLat/Long: 37.075024 / -104.869669Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.075040 / -104.869690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2425 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:010235 Expiration Date:2/6/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/24/2001
Spud Date:5/6/2001Spud Date Is:ACTUAL
Measured TD:2425 ft.Measured PB depth:2419 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL ( 2 )
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 211 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2352 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 439, Top: 0 ft., Bottom: 2352 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1743 ft.NN
VERMEJO COAL1743 ft.2288 ft.NN
TRINIDAD2288 ft.2368 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1916 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/2001
Treatment Summary:PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1ST STAGE: UNABLE TO PUMP 1/4# SAND. SCREEN OUT 20# LINEAR GEL FRAC PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1-A STAGE: PUMPED 50 GAL 7.5% HCL, PAD 110 BBL, SLF N/A, FLUSH 20 BBL. PERFORATIONS; 2138'-
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 124
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 124
CALC_BBLS_OIL 0
CALC_MCF_GAS 1
CASING_PRESS 25
MCF_GAS 1
Perforation Data:
Interval Top:1916 ft.# Of Holes:152
Interval Bottom:2226 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 372 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/30/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:372 ft.# Of Holes:299
Interval Bottom:2226 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2018                 Interval Top: 372 ft.    Interval Bottom: 1377 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/4/2018Treatment End Date:9/28/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1375' - 77', 1370' - 72', 1173' - 75', 1168' - 70', 1152' - 55' and 1115' - 18', Stage 2 - 1070' - 72', 1048' - 50', 1010' - 12', 983' - 85' and 919' - 21', Stage 3 - 889' - 90', 884' - 87', 880' - 82', 840' - 42' and 798' - 801', Stage 4 - 540' - 42', 516' - 18', 492' - 94', 469' - 72', 449' - 50' and 372' - 76' (49' net or 147 holes). A total of 156,622 gallons of produced water with 99,330 gallons of x-link and 105,849 lbs of 16/30 sand were pumped. All four stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):6094Max pressure during treatment (psi):3084
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.49
Recycled water used in treatment (bbls):6094Total flowback volume recovered (bbls):3689
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):105849Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/3/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BTU_GAS 994
CALC_BBLS_H2O 10
CALC_MCF_GAS 9
MCF_GAS 9
Perforation Data:
Interval Top:372 ft.# Of Holes:147
Interval Bottom:1377 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23201
GOR
GOR DeterminationMCFE
Average BOE per Day10.957
Average MCFE per Day63.566

 Federal Financial Assurance  i 

 Tribal Well  i No