|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/4/2005 Measured TD: 2485 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/4/2005 | Wellbore Permit | | Permit #: | 010233 | Expiration Date: | 2/6/2002 | Proposed Depth/Form: | 2495 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 6/7/2005 | Spud Date: | 5/8/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2485 ft. | Measured PB depth: | 2470 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL, SIL, CBL | Log Types: | CDL, SIL, CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 241 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 70, Top: 0 ft., Bottom: 241 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2427 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 2427 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2003 ft. | N | N | VERMEJO COAL | 2003 ft. | 2345 ft. | N | N | TRINIDAD | 2345 ft. | 2485 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/6/2007 Interval Top: 2106 ft. Interval Bottom: 2306 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2005 | Treatment Summary: | | Formation Treatment | Treatment Date: | 5/19/2005 | Treatment Summary: | 2005 Status Change
**Please note the corrected Bottom Interval depth!** |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 514 | BBLS_OIL | 0 | BTU_GAS | 1004 | CALC_BBLS_H2O | 514 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 84 | CASING_PRESS | 6 | MCF_GAS | 84 | TUBING_PRESS | 9 |
| Perforation Data: | Interval Top: | 2106 ft. | # Of Holes: | 96 | Interval Bottom: | 2306 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 9/4/2005 Interval Top: 808 ft. Interval Bottom: 2306 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 9/13/2005 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/4/2005 | Treatment Summary: | 09/09/2005 - Drilled out CIBP @ 2060' & commingled Formations. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2418 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/4/2005 | Test Method: | pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 514 | BTU_GAS | 1004 | CALC_BBLS_H2O | 514 | CALC_MCF_GAS | 84 | CASING_PRESS | 6 | GRAVITY_OIL | 1 | MCF_GAS | 84 | TUBING_PRESS | 9 |
| Perforation Data: | Interval Top: | 808 ft. | # Of Holes: | 214 | Interval Bottom: | 2306 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 10/17/2013 Interval Top: 808 ft. Interval Bottom: 2000 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 5/26/2005 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2005 | Treatment Summary: | ACIDIZED W/1000 GALS 15% HCL ACID. FRAC'D W/203,362 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 370,188# 12/20 BRADY SAND & 14,780# 16/30 | Formation Treatment | Treatment Date: | 5/22/2005 | Treatment Summary: | A. w/1500 gals 15% HCl acid. Frac'd w/203,362 gals 20# Delta 140 w/Sandwedge NT carrying 370,188# 12/20 Brady sand & 14,780# 16/30 Brady sand. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2006 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/28/2005 | Test Method: | Pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 187 | BTU_GAS | 1004 | CALC_BBLS_H2O | 187 | CALC_MCF_GAS | 9 | CASING_PRESS | 25 | GRAVITY_OIL | 1 | MCF_GAS | 9 | TUBING_PRESS | 15 |
| Perforation Data: | Interval Top: | 808 ft. | # Of Holes: | 118 | Interval Bottom: | 2000 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 47751 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 22.534 |
Average MCFE per Day | 130.729 |
Federal Financial Assurance | i | |
|
|