|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/4/2005 Measured TD: 2485 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/4/2005 | | Wellbore Permit | | | Permit #: | 010233 | Expiration Date: | 2/6/2002 | | Proposed Depth/Form: | 2495 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/7/2005 | | Spud Date: | 5/8/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2485 ft. | Measured PB depth: | 2470 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 241 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 241 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2427 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 2427 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2003 ft. | N | N | | VERMEJO COAL | 2003 ft. | 2345 ft. | N | N | | TRINIDAD | 2345 ft. | 2485 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/6/2007 Interval Top: 2106 ft. Interval Bottom: 2306 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2005 | | Treatment Summary: | | | Formation Treatment | | Treatment Date: | 5/19/2005 | | Treatment Summary: | 2005 Status Change
**Please note the corrected Bottom Interval depth!** |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 514 | | BBLS_OIL | 0 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 514 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 6 | | MCF_GAS | 84 | | TUBING_PRESS | 9 |
| | Perforation Data: | | Interval Top: | 2106 ft. | # Of Holes: | 96 | | Interval Bottom: | 2306 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 9/4/2005 Interval Top: 808 ft. Interval Bottom: 2306 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 9/13/2005 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/4/2005 | | Treatment Summary: | 09/09/2005 - Drilled out CIBP @ 2060' & commingled Formations. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2418 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/4/2005 | Test Method: | pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 514 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 514 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 6 | | GRAVITY_OIL | 1 | | MCF_GAS | 84 | | TUBING_PRESS | 9 |
| | Perforation Data: | | Interval Top: | 808 ft. | # Of Holes: | 214 | | Interval Bottom: | 2306 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 10/17/2013 Interval Top: 808 ft. Interval Bottom: 2000 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 5/26/2005 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2005 | | Treatment Summary: | ACIDIZED W/1000 GALS 15% HCL ACID. FRAC'D W/203,362 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 370,188# 12/20 BRADY SAND & 14,780# 16/30 | | Formation Treatment | | Treatment Date: | 5/22/2005 | | Treatment Summary: | A. w/1500 gals 15% HCl acid. Frac'd w/203,362 gals 20# Delta 140 w/Sandwedge NT carrying 370,188# 12/20 Brady sand & 14,780# 16/30 Brady sand. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2006 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/28/2005 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 187 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 187 | | CALC_MCF_GAS | 9 | | CASING_PRESS | 25 | | GRAVITY_OIL | 1 | | MCF_GAS | 9 | | TUBING_PRESS | 15 |
| | Perforation Data: | | Interval Top: | 808 ft. | # Of Holes: | 118 | | Interval Bottom: | 2000 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 40694 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 19.224 |
| Average MCFE per Day | 111.517 |
| Federal Financial Assurance | i | |
|
|