Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07207
Well Classification: CBM Status: PR - 12/8/2004
Well Name/No:HILL RANCH #35-04 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/8/2004
FacilityID:259234LocationID:307894
County:LAS ANIMAS #071Location:NWNW 35 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7938 ft.
Planned Location:368FNL  303 FWLLat/Long: 37.046974 / -104.864978Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.046920 / -104.864940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 12/8/2004             Measured TD: 2450 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 12/8/2004
Wellbore Permit
Permit #:010229 Expiration Date:2/6/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/2/2001
Spud Date:2/27/2001Spud Date Is:ACTUAL
Measured TD:2450 ft.Measured PB depth:2445 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SINGLE IND.,DENSITY/NEUTRON&CEMENT BOND
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 213 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2375 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 435, Top: 0 ft., Bottom: 2375 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1975 ft.NN
VERMEJO COAL1975 ft.2315 ft.NN
TRINIDAD2315 ft.2450 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/8/2004                 Interval Top: 1988 ft.    Interval Bottom: 2375 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:30N-095 PC PMP
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2001
Treatment Summary:ACIDIZED W/500 GALS 15% HCI ACID. FRAC'D W/55,313 GALS 20# DELTA 140 W/SANWEDGE NT CARRYING 23,900# 16/30 & 69,500# 12/20 BRADY SAND. ACIDIZED W/500 GALS 15% HCI ACID. FRAC'D W/42,145 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 18,600# 16/30 & (CONT)
Tubing Size:2.875 in.Tubing Setting Depth:2279 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/8/2004Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 81
BBLS_OIL 0
CALC_BBLS_H2O 81
CALC_MCF_GAS 1
CASING_PRESS 5
MCF_GAS 1
TUBING_PRESS 22
Perforation Data:
Interval Top:1988 ft.# Of Holes:48
Interval Bottom:2375 ft.Hole Size:0.46 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/29/2009                 Interval Top: 384 ft.    Interval Bottom: 2275 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/27/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2281 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 193
BBLS_OIL 0
BTU_GAS 1005
CALC_BBLS_H2O 193
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 33
CASING_PRESS 23
MCF_GAS 33
TUBING_PRESS 3
Perforation Data:
Interval Top:384 ft.# Of Holes:
Interval Bottom:2275 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 12/8/2004                 Interval Top: 384 ft.    Interval Bottom: 1296 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/27/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2001
Treatment Summary:ACIDIZED W/4,200 GALS 15% HCI ACID. FRAC'D W/184,981 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 30,567# 16/30 BRADY SD AND 365,686# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:384 ft.# Of Holes:92
Interval Bottom:1296 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16560
GOR
GOR DeterminationMCFE
Average BOE per Day7.817
Average MCFE per Day45.354

 Federal Financial Assurance  i 

 Tribal Well  i No