Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07206
Well Classification: CBM Status: PR - 7/23/2009
Well Name/No:HILL RANCH #35-07 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/23/2009
FacilityID:259233LocationID:307893
County:LAS ANIMAS #071Location:SWNE 35 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7786 ft.
Basin:RATON BASIN  
Planned Location:1681FNL  2530 FELLat/Long: 37.043354 / -104.856598Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.043320 / -104.856550Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/23/2009             Measured TD: 2305 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/23/2009
Wellbore Permit
Permit #:010228 Expiration Date:2/6/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/6/2002
Spud Date:5/2/2001Spud Date Is:ACTUAL
Measured TD:2305 ft.Measured PB depth:2277 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL(8)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 210 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 210 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2236 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 1165, Top: 1150 ft., Bottom: 2236 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2236 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 40 ft., Bottom: 952 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1681 ft.NN
VERMEJO COAL1681 ft.2151 ft.NN
TRINIDAD2151 ft.2231 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/23/2009                 Interval Top: 1955 ft.    Interval Bottom: 2107 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/14/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/13/2009
Treatment Summary:ACIDIZED W/ 1,000 GALS 15% HCI ACID. REFRAC'D W/ 78,375 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 6,814# 16/30 BRADY SAND & 153,054# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 205
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 205
CALC_BBLS_OIL 0
CALC_MCF_GAS 5
CASING_PRESS 25
MCF_GAS 5
Perforation Data:
Interval Top:1955 ft.# Of Holes:122
Interval Bottom:2107 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/23/2009                 Interval Top: 602 ft.    Interval Bottom: 2107 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/16/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/6/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2165 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BTU_GAS 1009
CALC_BBLS_H2O 93
CALC_BBLS_OIL 0
CALC_GOR 2818
CALC_MCF_GAS 33
CASING_PRESS 26
MCF_GAS 33
TUBING_PRESS 3
Perforation Data:
Interval Top:602 ft.# Of Holes:198
Interval Bottom:2107 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 7/23/2009                 Interval Top: 602 ft.    Interval Bottom: 1799 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/16/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/14/2009
Treatment Summary:ACIDIZED W/ 3,000 GALS 15% HCI ACID. FRAC'D W/ 140,810 GALS 20# DELTA 104 W/SANDWEDGE OS CARRYING 14,358# 16/30 BRADY SD; 235,529# 12/20 BRADY SD & 18,990# 12/20 BRADY SD W/SUPER LC & SUPERSET W.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:602 ft.# Of Holes:76
Interval Bottom:1799 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11172
GOR
GOR DeterminationMCFE
Average BOE per Day5.282
Average MCFE per Day30.607

 Federal Financial Assurance  i 

 Tribal Well  i No