|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 2/1/2021 Measured TD: 2090 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 2/1/2021 | Wellbore Permit | | Permit #: | 20010216 | Expiration Date: | 2/5/2002 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 5/24/2001 | Spud Date: | 2/18/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2090 ft. | Measured PB depth: | 2078 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP. DENSITY/NEUTRON, SINGLE INDUCTION & CEMENT BOND LOG | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 212 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2025 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 2025 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1626 ft. | N | N | VERMEJO COAL | 1626 ft. | 1956 ft. | N | N | TRINIDAD | 1956 ft. | 2090 ft. | N | N |
Formation VRMJ Formation Classification: CBM Status: SI - 2/1/2025 Interval Top: 1654 ft. Interval Bottom: 1890 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 5/25/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 1/3/2024 | Treatment End Date: | N/A | Treatment Summary: | bridge plug set at 1587' on 1/3/24 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 5/24/2001 | Treatment Summary: | SEE SCANNED DOC # 00906524 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/25/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 108 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 108 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 25 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 1654 ft. | # Of Holes: | 80 | Interval Bottom: | 1890 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | Y | 05/14/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 01/31/2021 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|