Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07199
Well Classification: CBM Status: PR - 8/2/2009
Well Name/No:HILL RANCH #07-02 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/2/2009
FacilityID:259158LocationID:307889
County:LAS ANIMAS #071Location:NWNE 7 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8300 ft.
Basin:RATON BASIN  
Planned Location:1140FNL  1745 FELLat/Long: 37.015915 / -104.926220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.015920 / -104.926210Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/2/2009             Measured TD: 2665 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/2/2009
Wellbore Permit
Permit #:20010201 Expiration Date:1/30/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/24/2001
Spud Date:4/17/2001Spud Date Is:ACTUAL
Measured TD:2665 ft.Measured PB depth:2641 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DNL, SIL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 395 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 0 ft., Bottom: 395 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2575 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 310 ft., Bottom: 2575 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2215 ft.NN
VERMEJO COAL2215 ft.2495 ft.NN
TRINIDAD2495 ft.2665 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/2/2009                  Interval Top: 2294 ft.    Interval Bottom: 2298 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:6/29/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/29/2009
Treatment Summary:RE-PERFED. ACIDIZED W/ 3,000 GALS 15% HCI ACID. REFRAC'D W/ 174,968 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 21,498# 16/30 BRADY SND & 182,411# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 315
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 315
CALC_BBLS_OIL 0
CALC_MCF_GAS 12
CASING_PRESS 25
MCF_GAS 12
Perforation Data:
Interval Top:2294 ft.# Of Holes:16
Interval Bottom:2298 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/2/2009                  Interval Top: 530 ft.    Interval Bottom: 2298 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/1/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/24/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2493 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 107
BTU_GAS 1009
CALC_BBLS_H2O 107
CALC_BBLS_OIL 0
CALC_MCF_GAS 53
CASING_PRESS 44
MCF_GAS 53
TUBING_PRESS 5
Perforation Data:
Interval Top:530 ft.# Of Holes:76
Interval Bottom:2298 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/2/2009                  Interval Top: 530 ft.    Interval Bottom: 1504 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/1/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/30/2009
Treatment Summary:ACIDIZED W/ 3,000 GALS 15% HCI ACID. FRAC'D W/ 123,586 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 13,883# 16/30 BRADY SND & 195,188# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:530 ft.# Of Holes:60
Interval Bottom:1504 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20263
GOR
GOR DeterminationMCFE
Average BOE per Day9.574
Average MCFE per Day55.525

 Federal Financial Assurance  i 

 Tribal Well  i No