|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/20/2002 Measured TD: 2250 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/20/2002 | | Wellbore Permit | | | Permit #: | 20020502 | Expiration Date: | 3/11/2003 | | Proposed Depth/Form: | 2500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/13/2002 | | Spud Date: | 3/16/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2250 ft. | Measured PB depth: | 2216 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 727 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 195, Top: 0 ft., Bottom: 727 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2224 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 2224 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2250 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 4/20/2002 Interval Top: 1198 ft. Interval Bottom: 2177 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 4/20/2002 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | PUMPING (30NO095 - PC ) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/13/2002 | | Treatment Summary: | PERFORATIONS: 2066'-76', 2080'-86', 2106'-2177' (384 SHOTS) FRAC 1ST STAGE: 106,356 20# GEL, 161,000# 16/30 , 50 GAL. HCL, 821 SCF N2 PERFORATIONS:1472'-75', 1501'-04' (24 SHOTS) FRAC 2ND STAGE: 21,891 15# GEL, 35,000# 16/30, 50 GAL. HCL, 598 SCF N2 PERFORATIONS: 1309'-12', 1338'-42', 1363'-08' (208 SHOTS) FRAC 3RD STAGE: 21,891 15# GEL, 35,000# 16/30, 50 GAL. HCL, 549 SCF N2. PERFORATIONS: 1198'-01', 1244'-50' (36 SHOTS) FRAC 4TH STAGE: 7,046 15# GEL, 35,000# 16/30, 50 GAL. HCL, 498 SCF N2 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2194 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2002 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 164 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 164 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 25 | | MCF_GAS | 10 |
| | Perforation Data: | | Interval Top: | 1198 ft. | # Of Holes: | 652 | | Interval Bottom: | 2177 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 20530 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 9.701 |
| Average MCFE per Day | 56.244 |
| Federal Financial Assurance | i | |
|
|