|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 7/1/2022 Measured TD: 1880 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 7/1/2022 | Wellbore Permit | | Permit #: | 20010153 | Expiration Date: | 1/25/2002 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/22/2001 | Spud Date: | 2/17/2001 | Spud Date Is: | ACTUAL | Measured TD: | 1880 ft. | Measured PB depth: | 1877 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP.DENSITY/NEUTRON, SINGLE INDUCTION & CEMENT BOND | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 60, Top: 0 ft., Bottom: 212 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1829 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 1829 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1378 ft. | N | N | VERMEJO COAL | 1378 ft. | 1736 ft. | N | N | TRINIDAD | 1736 ft. | 1880 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: SI - 7/1/2022 Interval Top: 1439 ft. Interval Bottom: 1670 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 6/2/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/22/2001 | Treatment Summary: | PERFORATIONS: 1657'-70' 4 SPF FRAC 1ST STAGE W/ 8,598 GAL. 20# DELTA FRAC 140 (INC. PAD), 16,280# 16/30 & 95,275 SCF N2. PERFORATIONS: 1488'-1502' 4 SPF FRAC 2ND STAGE W/ 15,456 GAL. 20# DELTA FRAC 140 (INC. PAD), 33,210# 16/30 &169,867 SCF N2. PERFORATIONS: 1468'-74' 4 SPF FRAC 3RD STAGE W/ 15,030 GAL. 20# DELTA FRAC 140 (INC. PAD), 33,210# 16/30 & 169,867 SCF N2 PERFORATIONS: 1439'-55' 4 SPF FRAC 4TH STAGE W/ 16,705 GAL. 20# DELTA FRAC 140 (INC. PAD), 32,590# 16/30 & 185,455 SCF N2 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1705 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/25/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 108 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 108 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 0 | CASING_PRESS | 25 | MCF_GAS | 0 |
| Perforation Data: | Interval Top: | 1439 ft. | # Of Holes: | 208 | Interval Bottom: | 1670 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2022 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|